Scheduling a flowline manufacturing cell with sequence dependent family setup times
DOI10.1016/S0377-2217(99)00387-2zbMATH Open0965.90023MaRDI QIDQ1580980FDOQ1580980
Authors: Jeffrey E. Schaller, Jatinder N. D. Gupta, Asoo J. Vakharia
Publication date: 23 November 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Recommendations
- Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- Minimizing flow time in a flow-line manufacturing cell with family setup times
- Scheduling flexible flow lines with sequence-dependent setup times
- Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
- Heuristics and sequence-dependent set-up jobs in flow line cells
- Flow shop batching and scheduling with sequence-dependent setup times
- A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
- Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis
- FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES
Management decision making, including multiple objectives (90B50) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Optimal two- and three-stage production schedules with set-up time included
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- A survey and evaluation of static flowshop scheduling heuristics
- An Evaluation of Flow Shop Sequencing Heuristics
- The two-machine sequence dependent flowshop scheduling problem
- FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES
- A new heuristic method for the flow shop sequencing problem
- Title not available (Why is that?)
Cited In (40)
- Impact of family-based scheduling on transfer batches in a job shop manufacturing cell
- Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
- Flow shop batching and scheduling with sequence-dependent setup times
- Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups
- An improved branch and bound procedure for scheduling a flow line manufacturing cell
- An efficient model-based branch-and-price algorithm for unrelated-parallel machine batching and scheduling problems
- A scheduling problem in the baking industry
- A hybrid heuristic approach to minimize number of tardy jobs in group technology systems
- Scheduling in cellular manufacturing systems: an heuristic approach
- Family scheduling with batch availability in flow shops to minimize makespan
- A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times
- A review of TSP based approaches for flowshop scheduling
- New effective MILP models for PFSPs arising from real applications
- A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem
- A comprehensive review of flowshop group scheduling literature
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem
- Set-up games: a heuristic game-theoretic approach to set-up decisions for heterarchical manufacturing systems
- Scheduling jobs families with learning effect on the setup
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem
- A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
- Effect of solution representations on tabu search in scheduling applications
- Heuristics and sequence-dependent set-up jobs in flow line cells
- Cluster analysis to minimize sequence dependent changeover times
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- Robust scheduling on a single machine to minimize total flow time
- A survey of scheduling problems with setup times or costs
- Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints
- Modeling and solving the flow-shop scheduling problem with sequence-dependent setup times by firefly algorithm (case study: automotive industry)
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
- Solving the serial batching problem in job shop manufacturing systems
- Process planning for circuit card assembly on a series of dual head placement machines
- Using genetic algorithm in two-machine flexible flow-shop scheduling with setup times
- Intelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem
- A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem
- Minimizing flow time in a flow-line manufacturing cell with family setup times
- An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes
- An asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problem
- Scheduling with product family set-up times: an application in TFT LCD manufacturing
- Scheduling flexible flow lines with sequence-dependent setup times
- A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment
This page was built for publication: Scheduling a flowline manufacturing cell with sequence dependent family setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1580980)