A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
From MaRDI portal
Publication:709158
Recommendations
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- A combined branch-and bound and genetic algorithm based approach for a flowshop scheduling problem
- scientific article; zbMATH DE number 7647880
- A Genetic Algorithm for the Batch Scheduling with Sequence-Dependent Setup Times
- A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly
- An improved branch and bound procedure for scheduling a flow line manufacturing cell
- Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
- A genetic algorithm for flow shop scheduling problems
Cites work
- scientific article; zbMATH DE number 4149877 (Why is no real title available?)
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell
- A survey of scheduling problems with setup times or costs
- An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems
- Forming part families by using genetic algorithm and designing machine cells under demand changes
- Guest editorial: Hybrid metaheuristics
- Hybrid metaheuristics with evolutionary algorithms specializing in intensification and diversification: overview and progress report
- Hybridizing exact methods and metaheuristics: a taxonomy
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
Cited in
(7)- Heuristic algorithm for univariate stratification problem
- An improved branch and bound procedure for scheduling a flow line manufacturing cell
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- A comprehensive review of flowshop group scheduling literature
- The third comprehensive survey on scheduling problems with setup times/costs
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
- A branch and bound algorithm for dynamic resource allocation in population disease management
This page was built for publication: A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q709158)