Single machine hierarchical scheduling with customer orders and multiple job classes
From MaRDI portal
Publication:1374425
DOI10.1023/A:1018913902852zbMath0888.90091MaRDI QIDQ1374425
Jatinder N. D. Gupta, Johnny C. Ho, Jack A. A. van der Veen
Publication date: 28 January 1998
Published in: Annals of Operations Research (Search for Journal in Brave)
makespan; polynomial time algorithms; hierarchical scheduling; single machine bi-criteria scheduling
90C60: Abstract computational complexity for mathematical programming problems
90B35: Deterministic scheduling theory in operations research
Related Items
A time-dependent multiple criteria single-machine scheduling problem, Scheduling parallel machines for the customer order problem, Minimizing customer order lead-time in a two-stage assembly supply chain, The complexity of customer order scheduling problems on parallel machines, Two simulated annealing-based heuristics for the job shop scheduling problem, Scheduling the production of two-component jobs on a single machine, Preemptive multiprocessor order scheduling to minimize total weighted flowtime, Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs, Multicriteria scheduling problems: a survey