Minimizing customer order lead-time in a two-stage assembly supply chain
From MaRDI portal
(Redirected from Publication:940914)
Recommendations
Cites work
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Single machine hierarchical scheduling with customer orders and multiple job classes
- The Complexity of Flowshop and Jobshop Scheduling
- The customer order lead-time problem on parallel machines
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
Cited in
(10)- Coordinated supply chain management
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Coordinating supply chains with stochastic demand by crashing lead times
- Optimizing delivery lead time/inventory placement in a two-stage production/distribution system
- Scheduling in supply chain environment
- An agent-based negotiation model on price and delivery date in a fashion supply chain
- Minimizing response time in a two-stage supply chain system with variable lead time and stochastic demand
- The implication of time-based payment contract in the decentralized assembly system
- Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms
- New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: a computational evaluation
This page was built for publication: Minimizing customer order lead-time in a two-stage assembly supply chain
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q940914)