The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
From MaRDI portal
Publication:4849333
Recommendations
- scientific article; zbMATH DE number 1979499
- A branch and bound algorithm for the two-stage assembly scheduling problem
- The three-stage assembly flowshop scheduling problem
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic
Cited in
(66)- Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Two-stage no-wait scheduling models with setup and removal times separated
- Concurrent flowshop scheduling to minimize makespan.
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machine
- A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
- Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms
- Minimizing the makespan for a two-stage three-machine assembly flow shop problem with the sum-of-processing-time based learning effect
- Two-machine flowshop scheduling in a physical examination center
- Minimizing the cycle time in two-sided assembly lines with assignment restrictions: improvements and a simple algorithm
- A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness
- Polynomial time approximation algorithms for machine scheduling: Ten open problems
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
- Scheduling for two-stage production system with setup and assembly operations
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
- A scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshop
- Optimization study of three-stage assembly flowshop problem in pharmacy automation dispensing systems
- Two-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effect
- Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing
- Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times
- Flow-shop scheduling with setup and assembly operations
- Flexible flow shop scheduling with uniform parallel machines
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time
- Assembly flowshop scheduling problem: speed-up procedure and computational evaluation
- Scheduling with centralized and decentralized batching policies in concurrent open shops
- Two-stage flowshop scheduling problems with identical and batch processors
- On the two-stage hybrid flow shop with dedicated machines
- Minimizing the total completion time in a distributed two stage assembly system with setup times
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
- Méthode heuristique pour le problème de flow shop hybride avec machines dédiées
- A computational study of heuristics for two-stage flexible flowshops
- scientific article; zbMATH DE number 1979499 (Why is no real title available?)
- On Approximation Algorithms for Two-Stage Scheduling Problems
- The two-stage assembly flow shop scheduling with an availability constraint: worst case analysis
- A heuristic hybrid framework for vector job scheduling
- A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration
- Flowshop-scheduling problems with makespan criterion: a review
- The three-stage assembly flowshop scheduling problem
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
- Distributed assembly permutation flow-shop scheduling problem with sequence-dependent set-up times using a novel biogeography-based optimization algorithm
- A biased‐randomized iterated local search for the distributed assembly permutation flow‐shop problem
- An effective algorithm for flexible assembly job‐shop scheduling with tight job constraints
- Flow shop scheduling problem with non-linear learning effects: a linear approximation scheme for non-technical users
- Meta-Lamarckian-based iterated greedy for optimizing distributed two-stage assembly flowshops with mixed setups
- Lot streaming for a two-stage assembly system in the presence of handling costs
- Three-stage assembly flow shop scheduling problem with a fixed maintenance period
- On the two-stage assembly flow shop problem
- Coordinated order scheduling and outsourcing on dedicated parallel machines
- New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: a computational evaluation
- Batching decisions for assembly production systems
- Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
- Production-logistics cooperative scheduling in a two-stage assembly flow-shop with deteriorating robotic arm: a problem-specific heuristic
- Cyclic robot scheduling for 3D printer-based flexible assembly systems
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- A note on the complexity of the concurrent open shop problem
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
- Minimizing customer order lead-time in a two-stage assembly supply chain
- The production scheduling problem in a multi-page invoice printing system
This page was built for publication: The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4849333)