A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration

From MaRDI portal
Publication:5059372

DOI10.1080/0305215X.2019.1632303OpenAlexW2963240599WikidataQ127499299 ScholiaQ127499299MaRDI QIDQ5059372FDOQ5059372


Authors: Chin-Chia Wu, Danyu Bai, Ameni Azzouz, I-Hong Chung, Shuenn-Ren Cheng, Dwueng-Chwuan Jhwueng, Win-Chin Lin, Lamjed ben Said Edit this on Wikidata


Publication date: 23 December 2022

Published in: Engineering Optimization (Search for Journal in Brave)