A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration (Q5059372)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 7637148
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration |
scientific article; zbMATH DE number 7637148 |
Statements
A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration (English)
0 references
23 December 2022
0 references
two-stage assembly
0 references
genetic algorithm
0 references
simulated annealing
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0.8668704032897949
0 references
0.8553630709648132
0 references
0.8467298746109009
0 references
0.840332567691803
0 references