Assembly flowshop scheduling problem: speed-up procedure and computational evaluation
DOI10.1016/J.EJOR.2021.10.001zbMATH Open1495.90070OpenAlexW3205822589MaRDI QIDQ2670518FDOQ2670518
Authors: Victor Fernandez-Viagas, Carla Talens, Jose M. Framinan
Publication date: 11 March 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2021.10.001
Recommendations
- The three-stage assembly flowshop scheduling problem
- Optimal scheduling of the 3-machine assembly-type flow shop
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
heuristicsschedulingmakespanflow shopcomputational evaluationASPaccelerationsmultistage assemblyspeed-up procedurethree-stage assemblytwo-stage assembly
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Introduction to algorithms.
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling. Theory, algorithms, and systems.
- The distributed permutation flowshop scheduling problem
- Benchmarks for basic scheduling problems
- An improved NEH heuristic to minimize makespan in permutation flow shops
- New hard benchmark for flowshop scheduling problems minimising makespan
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- Some efficient heuristic methods for the flow shop sequencing problem
- An improved NEH-based heuristic for the permutation flowshop problem
- An Evaluation of Flow Shop Sequencing Heuristics
- An empirical analysis of the optimality rate of flow shop heuristics
- The permutation flow shop with buffers: A tabu search approach
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- A hybrid tabu search heuristic for the two-stage assembly scheduling problem
- The three-stage assembly flowshop scheduling problem
- Heuristics for the flow line problem with setup costs
- The flow shop with parallel machines: A tabu search approach
- Coordinated scheduling of customer orders for quick response
- Order scheduling in an environment with dedicated resources in parallel
- Title not available (Why is that?)
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- New approximate algorithms for the customer order scheduling problem with total completion time objective
- The production scheduling problem in a multi-page invoice printing system
- Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic
- Reduction of permutation flowshop problems to single machine problems using machine dominance relations
- Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling
Cited In (3)
This page was built for publication: Assembly flowshop scheduling problem: speed-up procedure and computational evaluation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2670518)