Scheduling for two-stage production system with setup and assembly operations
From MaRDI portal
Publication:1879793
DOI10.1016/S0305-0548(03)00165-5zbMath1100.90511MaRDI QIDQ1879793
Publication date: 23 September 2004
Published in: Computers \& Operations Research (Search for Journal in Brave)
SchedulingAssembly operationMachining operationSetup timeBlock sizePseudo-dynamic programmingTwo-stage production system
Related Items (3)
Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures ⋮ Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry ⋮ The production scheduling problem in a multi-page invoice printing system
Cites Work
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Games, Critical Paths and Assignment Problems in Permutation Flow Shops and Cyclic Scheduling Flow Line Environments
- Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach
- Minimizing production flow time in a process and assembly job shop
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- Cyclic scheduling in flow lines: Modeling observations, effective heuristics and a cycle time minimization procedure
This page was built for publication: Scheduling for two-stage production system with setup and assembly operations