Two-stage assembly scheduling problem for minimizing total tardiness with setup times
From MaRDI portal
Publication:2293429
Recommendations
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness
- A scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshop
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- Minimizing the total completion time in a distributed two stage assembly system with setup times
- Scheduling for two-stage production system with setup and assembly operations
- A branch and bound algorithm for the two-stage assembly scheduling problem
- scientific article; zbMATH DE number 1979499
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
Cites work
- A branch and bound algorithm for the two-stage assembly scheduling problem
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
- A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties
- A hybrid tabu search heuristic for the two-stage assembly scheduling problem
- A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
- A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- A survey of scheduling problems with setup times or costs
- A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- Generating Experimental Data for Computational Testing with Machine Scheduling Applications
- Group-shop scheduling with sequence-dependent set-up and transportation times
- Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Optimal scheduling of the 3-machine assembly-type flow shop
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- The third comprehensive survey on scheduling problems with setup times/costs
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
Cited in
(12)- The two-stage assembly scheduling problem to minimize total completion time with setup times
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness
- A scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshop
- Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs
- An estimation of distribution algorithm for scheduling problem of flexible manufacturing systems using Petri nets
- Minimizing the total completion time in a distributed two stage assembly system with setup times
- A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time
- New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: a computational evaluation
- The fourth comprehensive review of scheduling problems with setup times
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
This page was built for publication: Two-stage assembly scheduling problem for minimizing total tardiness with setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2293429)