Asiye Aydilek

From MaRDI portal
(Redirected from Asiye Aydilek)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times
Engineering Optimization
2023-10-10Paper
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure
Journal of Industrial and Management Optimization
2021-09-10Paper
Two-stage assembly scheduling problem for minimizing total tardiness with setup times
Applied Mathematical Modelling
2020-02-05Paper
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
Applied Mathematical Modelling
2020-01-27Paper
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
Applied Mathematics and Computation
2020-01-14Paper
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
European Journal of Operational Research
2018-05-22Paper
Single machine scheduling problem with interval processing times to minimize mean weighted completion time
Computers & Operations Research
2016-11-10Paper
Insider trading with product differentiation
Journal of Economics
2014-09-04Paper


Research outcomes over time


This page was built for person: Asiye Aydilek