No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
From MaRDI portal
Publication:2284308
Recommendations
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- Total completion time with makespan constraint in no-wait flowshops with setup times
- Minimizing total tardiness in no-wait flowshops
- Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated
- Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
Cites work
- A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- A survey of scheduling problems with no-wait in process
- General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach
- Generating Experimental Data for Computational Testing with Machine Scheduling Applications
- Heuristics for no-wait flowshops with makespan subject to mean completion time
- Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times
- Minimizing total tardiness in no-wait flowshops
- Multicriteria scheduling. Theory, models and algorithms. Translated from the French by Henry Scott.
- NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness
- New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- No-wait flowshops with bicriteria of makespan and maximum lateness.
- Order scheduling with tardiness objective: improved approximate solutions
- Some heuristics for no-wait flowshops with total tardiness criterion
- Some new results in flow shop scheduling
- The significance of reducing setup times/setup costs
- The third comprehensive survey on scheduling problems with setup times/costs
- Total completion time minimization in a computer system with a server and two parallel processors
- Total completion time with makespan constraint in no-wait flowshops with setup times
- Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated
- Total flowtime in no-wait flowshops with separated setup times.
- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
Cited in
(18)- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- A bi-objective branch-and-bound algorithm for the unit-time job shop scheduling: a mixed graph coloring approach
- Total completion time with makespan constraint in no-wait flowshops with setup times
- Minimizing total tardiness in no-wait flowshops
- The flow shop problem with time lags and separated setup times
- No-wait flowshops with bicriteria of makespan and total completion time
- Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated
- scientific article; zbMATH DE number 5247431 (Why is no real title available?)
- Shop scheduling in manufacturing environments: a review
- Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times
- Intelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem
- A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness
- An efficient iterated greedy algorithm for a multi-objective no-wait flow shop problem with sequence dependent setup times
- A reactive iterated greedy algorithm for the no-wait flowshop to minimize total tardiness
- An ALNS to optimize makespan subject to total completion time for no-wait flow shops with sequence-dependent setup times
- Minimising makespan and total tardiness for the flowshop group scheduling problem with sequence dependent setup times
- A Q-learning-based variable greedy algorithm to minimize the sum of total earliness and tardiness in a no-wait flowshop scheduling problem
- The fourth comprehensive review of scheduling problems with setup times
This page was built for publication: No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2284308)