Publication | Date of Publication | Type |
---|
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times | 2023-10-10 | Paper |
Algorithms for three-machine flowshop scheduling problem to minimize makespan with uncertain processing times | 2023-09-19 | Paper |
Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times | 2021-11-12 | Paper |
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure | 2021-09-10 | Paper |
Minimizing total completion time for flowshop scheduling problem with uncertain processing times | 2021-07-27 | Paper |
Algorithms for four-machine flowshop scheduling problem with uncertain processing times to minimize makespan | 2020-05-13 | Paper |
Two-stage assembly scheduling problem for minimizing total tardiness with setup times | 2020-02-05 | Paper |
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times | 2020-01-27 | Paper |
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan | 2020-01-14 | Paper |
Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness | 2019-01-29 | Paper |
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times | 2018-10-09 | Paper |
A survey of scheduling problems with no-wait in process | 2018-05-24 | Paper |
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan | 2018-05-22 | Paper |
Minimizing total tardiness in no-wait flowshops | 2017-04-25 | Paper |
Single machine scheduling problem with interval processing times to minimize mean weighted completion time | 2016-11-10 | Paper |
The third comprehensive survey on scheduling problems with setup times/costs | 2016-10-06 | Paper |
Total completion time with makespan constraint in no-wait flowshops with setup times | 2016-06-23 | Paper |
Heuristics for no-wait flowshops with makespan subject to mean completion time | 2014-06-27 | Paper |
Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times | 2011-06-28 | Paper |
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times | 2010-12-14 | Paper |
Permutation flow shops with exact time lags to minimise maximum lateness | 2010-11-07 | Paper |
New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness | 2010-11-07 | Paper |
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times | 2010-10-25 | Paper |
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time | 2010-06-28 | Paper |
The two-stage assembly scheduling problem to minimize total completion time with setup times | 2009-05-19 | Paper |
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan | 2009-04-03 | Paper |
Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness | 2008-12-04 | Paper |
https://portal.mardi4nfdi.de/entity/Q3542490 | 2008-12-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q5437763 | 2008-01-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q5437765 | 2008-01-28 | Paper |
Some effective heuristics for no-wait flowshops with setup times to minimize total completion time | 2008-01-25 | Paper |
The significance of reducing setup times/setup costs | 2008-01-21 | Paper |
Batching deteriorating items with applications in computer communication and reverse logistics | 2007-06-13 | Paper |
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times | 2007-05-11 | Paper |
https://portal.mardi4nfdi.de/entity/Q3436602 | 2007-05-11 | Paper |
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm | 2007-03-21 | Paper |
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times | 2007-03-21 | Paper |
Using mixed graph coloring to minimize total completion time in job shop scheduling | 2007-01-11 | Paper |
Scheduling multi-stage parallel-processor services to minimize average response time | 2006-02-13 | Paper |
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests | 2006-01-17 | Paper |
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times | 2005-11-04 | Paper |
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application | 2005-11-01 | Paper |
Flowshop scheduling problem to minimize total completion time with random and bounded processing times | 2005-04-04 | Paper |
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times | 2005-03-16 | Paper |
No-wait flowshops with bicriteria of makespan and total completion time | 2005-03-14 | Paper |
A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness | 2005-02-23 | Paper |
A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime | 2005-01-31 | Paper |
Job lateness in flowshops with setup and removal times separated | 2005-01-19 | Paper |
Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times | 2003-12-03 | Paper |
New heuristics for no-wait flowshops to minimize makespan. | 2003-11-17 | Paper |
No-wait flowshops with bicriteria of makespan and maximum lateness. | 2003-10-14 | Paper |
Total flowtime in no-wait flowshops with separated setup times. | 2003-09-07 | Paper |
Two-machine flowshop minimum-length scheduling problem with random and bounded processing times | 2003-06-23 | Paper |
The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime | 2003-04-28 | Paper |
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications | 2002-05-14 | Paper |
The Tricriteria Two-Machine Flowshop Scheduling Problem | 2002-01-30 | Paper |
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times | 2000-09-26 | Paper |
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function | 1999-12-20 | Paper |
Stochastically minimizing total flowtime in flowshops with no waiting space | 1999-11-08 | Paper |
Scheduling in stochastic flowshops with independent setup, processing and removal times | 1997-09-17 | Paper |
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness | 1997-01-06 | Paper |
Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns | 1995-11-09 | Paper |
Two-machine ordered flowshop scheduling under random breakdowns | 1995-01-11 | Paper |
https://portal.mardi4nfdi.de/entity/Q4306273 | 1994-09-19 | Paper |