Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times2023-10-10Paper
Algorithms for three-machine flowshop scheduling problem to minimize makespan with uncertain processing times2023-09-19Paper
Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times2021-11-12Paper
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure2021-09-10Paper
Minimizing total completion time for flowshop scheduling problem with uncertain processing times2021-07-27Paper
Algorithms for four-machine flowshop scheduling problem with uncertain processing times to minimize makespan2020-05-13Paper
Two-stage assembly scheduling problem for minimizing total tardiness with setup times2020-02-05Paper
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times2020-01-27Paper
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan2020-01-14Paper
Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness2019-01-29Paper
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times2018-10-09Paper
A survey of scheduling problems with no-wait in process2018-05-24Paper
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan2018-05-22Paper
Minimizing total tardiness in no-wait flowshops2017-04-25Paper
Single machine scheduling problem with interval processing times to minimize mean weighted completion time2016-11-10Paper
The third comprehensive survey on scheduling problems with setup times/costs2016-10-06Paper
Total completion time with makespan constraint in no-wait flowshops with setup times2016-06-23Paper
Heuristics for no-wait flowshops with makespan subject to mean completion time2014-06-27Paper
Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times2011-06-28Paper
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times2010-12-14Paper
Permutation flow shops with exact time lags to minimise maximum lateness2010-11-07Paper
New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness2010-11-07Paper
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times2010-10-25Paper
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time2010-06-28Paper
The two-stage assembly scheduling problem to minimize total completion time with setup times2009-05-19Paper
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan2009-04-03Paper
Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness2008-12-04Paper
https://portal.mardi4nfdi.de/entity/Q35424902008-12-01Paper
https://portal.mardi4nfdi.de/entity/Q54377652008-01-28Paper
https://portal.mardi4nfdi.de/entity/Q54377632008-01-28Paper
Some effective heuristics for no-wait flowshops with setup times to minimize total completion time2008-01-25Paper
The significance of reducing setup times/setup costs2008-01-21Paper
Batching deteriorating items with applications in computer communication and reverse logistics2007-06-13Paper
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times2007-05-11Paper
https://portal.mardi4nfdi.de/entity/Q34366022007-05-11Paper
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times2007-03-21Paper
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm2007-03-21Paper
Using mixed graph coloring to minimize total completion time in job shop scheduling2007-01-11Paper
Scheduling multi-stage parallel-processor services to minimize average response time2006-02-13Paper
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests2006-01-17Paper
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times2005-11-04Paper
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application2005-11-01Paper
Flowshop scheduling problem to minimize total completion time with random and bounded processing times2005-04-04Paper
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times2005-03-16Paper
No-wait flowshops with bicriteria of makespan and total completion time2005-03-14Paper
A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness2005-02-23Paper
A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime2005-01-31Paper
Job lateness in flowshops with setup and removal times separated2005-01-19Paper
Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times2003-12-03Paper
New heuristics for no-wait flowshops to minimize makespan.2003-11-17Paper
No-wait flowshops with bicriteria of makespan and maximum lateness.2003-10-14Paper
Total flowtime in no-wait flowshops with separated setup times.2003-09-07Paper
Two-machine flowshop minimum-length scheduling problem with random and bounded processing times2003-06-23Paper
The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime2003-04-28Paper
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications2002-05-14Paper
The tricriteria two-machine flowshop scheduling problem2002-01-30Paper
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times2000-09-26Paper
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function1999-12-20Paper
Stochastically minimizing total flowtime in flowshops with no waiting space1999-11-08Paper
Scheduling in stochastic flowshops with independent setup, processing and removal times1997-09-17Paper
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness1997-01-06Paper
Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns1995-11-09Paper
Two-machine ordered flowshop scheduling under random breakdowns1995-01-11Paper