Job lateness in flowshops with setup and removal times separated
From MaRDI portal
Publication:3157767
DOI10.1057/palgrave.jors.2600583zbMath1140.90386OpenAlexW2015138873MaRDI QIDQ3157767
Ali Allahverdi, Tariq A. Aldowaisan
Publication date: 19 January 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600583
Related Items
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications ⋮ A bicriteria flowshop scheduling problem with setup times ⋮ Total flowtime in no-wait flowshops with separated setup times. ⋮ A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups ⋮ A new heuristic and dominance relations for no-wait flowshops with setups ⋮ Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup