A bicriteria flowshop scheduling problem with setup times
From MaRDI portal
Publication:865584
DOI10.1016/j.amc.2006.05.160zbMath1112.90021OpenAlexW1994469586MaRDI QIDQ865584
Publication date: 19 February 2007
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2006.05.160
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
A bicriteria parallel machine scheduling with a learning effect of setup and removal times ⋮ The third comprehensive survey on scheduling problems with setup times/costs ⋮ Comments on ``A bicriteria flowshop scheduling problem with setup times ⋮ A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times
Cites Work
- Job lateness in a two-machine flowshop with setup times separated
- Two-machine group scheduling problem with blocking and anticipatory setups
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times.
- Future paths for integer programming and links to artificial intelligence
- A bicriteria scheduling with sequence-dependent setup times
- Optimal two- and three-stage production schedules with setup times included
- Job lateness in flowshops with setup and removal times separated
- Sequency on two and three machines with setup, processing and removal times separated
- Flowshop and Jobshop Schedules: Complexity and Approximation
- The Complexity of Flowshop and Jobshop Scheduling
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns