Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns

From MaRDI portal
Publication:4849306

DOI10.1057/jors.1995.122zbMath0832.90048OpenAlexW2074699278MaRDI QIDQ4849306

Ali Allahverdi

Publication date: 9 November 1995

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.1995.122




Related Items

Uncertain flexible flow shop scheduling problem subject to breakdownsImprovements in the power of empirical stochastic dominance comparisons through kernel density estimation: a monte carlo studyScheduling in stochastic flowshops with independent setup, processing and removal timesA bicriteria flowshop scheduling problem with setup timesMinimizing makespan for scheduling stochastic job shop with random breakdownAlgorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up timesTotal flowtime in no-wait flowshops with separated setup times.A two-machine flowshop scheduling problem with a separated maintenance constraintA heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failuresA new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardinessScheduling under machine breakdown in a continuous process industryA new heuristic and dominance relations for no-wait flowshops with setupsPlanning and scheduling of the make-and-pack dairy production under lifetime uncertaintyStochastically minimizing total flowtime in flowshops with no waiting spaceTwo-machine flowshop group scheduling problemOn stochastic machine scheduling with general distributional assumptionsTwo-machine proportionate flowshop scheduling with breakdowns to minimize maximum latenessA branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times