Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
From MaRDI portal
Publication:2563893
Recommendations
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
- Two-machine ordered flowshop scheduling under random breakdowns
- Single-machine scheduling subject to stochastic breakdowns
- scientific article; zbMATH DE number 640393
- scientific article; zbMATH DE number 830013
Cites work
- Focused Scheduling in Proportionate Flowshops
- scientific article; zbMATH DE number 3425355 (Why is no real title available?)
- scientific article; zbMATH DE number 3471786 (Why is no real title available?)
- scientific article; zbMATH DE number 830013 (Why is no real title available?)
- Job lateness in a two-machine flowshop with setup times separated
- Minimizing Maximum Lateness in a Two-Machine Open Shop
- Minimizing the Expected Makespan in Stochastic Flow Shops
- On Johnson's Two-Machine Flow Shop with Random Processing Times
- On two-machine scheduling with release and due dates to minimize maximum lateness
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
- Schedulingn nonoverlapping jobs and two stochastic jobs in a flow shop
- Single-machine scheduling subject to stochastic breakdowns
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties
- Stochastically minimizing the makespan in flow shops
- Two-machine ordered flowshop scheduling under random breakdowns
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
Cited in
(17)- Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Scheduling under machine breakdown in a continuous process industry
- Stochastically minimizing total flowtime in flowshops with no waiting space
- A note on makespan minimization in proportionate flow shops
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures
- The proportionate two-machine no-wait job shop scheduling problem
- scientific article; zbMATH DE number 3908146 (Why is no real title available?)
- Minimizing makespan for scheduling stochastic job shop with random breakdown
- Minimizing makespan in an ordered flow shop with machine-dependent processing times
- Two-machine flow shop scheduling problem with an outsourcing option
- Two-machine flowshop minimum-length scheduling problem with random and bounded processing times
- Uncertain flexible flow shop scheduling problem subject to breakdowns
- Proportionate flow shop scheduling with rejection
- Two-agent proportionate flowshop scheduling with deadlines: polynomial-time optimization algorithms
- Proportionate flow shop games
- Flow shops with machine maintenance: ordered and proportionate cases
This page was built for publication: Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2563893)