Two-machine ordered flowshop scheduling under random breakdowns
From MaRDI portal
Recommendations
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
- scientific article; zbMATH DE number 830013
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown
Cites work
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Flowshop Sequencing Problem with Ordered Processing Time Matrices
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
- The Complexity of Flowshop and Jobshop Scheduling
Cited in
(19)- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
- On stochastic machine scheduling with general distributional assumptions
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Stochastically minimizing total flowtime in flowshops with no waiting space
- Schedule execution for two-machine flow-shop with interval processing times
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
- Johnson's problem with stochastic processing times and optimal service level
- Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
- scientific article; zbMATH DE number 3908146 (Why is no real title available?)
- On Johnson's Two-Machine Flow Shop with Random Processing Times
- Minimizing makespan for scheduling stochastic job shop with random breakdown
- A Probabilistic Analysis of Two-Machine Flowshops
- Two-machine flowshop minimum-length scheduling problem with random and bounded processing times
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
- scientific article; zbMATH DE number 830013 (Why is no real title available?)
- Uncertain flexible flow shop scheduling problem subject to breakdowns
- Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown
- Two-machine stochastic flow shops with blocking and the traveling salesman problem
This page was built for publication: Two-machine ordered flowshop scheduling under random breakdowns
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1341394)