Minimizing Maximum Lateness in a Two-Machine Open Shop
From MaRDI portal
Cited in
(32)- Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop
- On the complexity of preemptive open-shop scheduling problems
- Minimizing expected makespan in a two-machine stochastic open shop with Poisson arrival
- The two-machine flowshop scheduling problem with total tardiness
- On the complexity of generalized due date scheduling problems
- Job lateness in a two-machine flowshop with setup times separated
- Two scheduling problems with fuzzy due-dates
- The generalized shifting bottleneck procedure
- Two machine open shop scheduling problems with bi-criteria
- On the complexity of preemptive openshop scheduling problems
- One machine scheduling problem with fuzzy duedates
- Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity
- Open shop scheduling problems with late work criteria.
- An efficient tabu search approach for the two-machine preemptive open shop scheduling problem.
- A linear time approximation scheme for makespan minimization in an open shop with release dates
- Scheduling two-machine preemptive open shops to minimize total completion time
- Complexity of mixed shop scheduling problems: A survey
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches
- A novel complex network based dynamic rule selection approach for open shop scheduling problem with release dates
- Four decades of research on the open-shop scheduling problem to minimize the makespan
- Minimizing the weighted number of tardy jobs on multiple machines: a review
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
- Multicriteria scheduling
- An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system
- Minimizing total flowtime and maximum job lateness in the twomachine flowshop system: a computerized algorithm
- Scheduling ordered open shops
- On the complexity of proportionate open shop and job shop problems
- Scheduling preemptive open shops to minimize total tardiness
- Minimizing the sojourn time of open shop scheduling problems with unit-time operations
- A note on the flow time and the number of tardy jobs in stochastic open shops
- Dense open-shop schedules with release times
This page was built for publication: Minimizing Maximum Lateness in a Two-Machine Open Shop
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3960459)