Two scheduling problems with fuzzy due-dates
From MaRDI portal
Publication:1198861
DOI10.1016/0165-0114(92)90372-BzbMath0767.90037MaRDI QIDQ1198861
Teruo Masuda, Hiroaki Ishii, Minoru Tada
Publication date: 16 January 1993
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items
SOME GENERAL PROPERTIES OF A FUZZY SINGLE MACHINE SCHEDULING PROBLEM, Parallel machine scheduling models with fuzzy processing times, The EDD rule for fuzzy job time, Chance-constrained model for uncertain job shop scheduling problem, Optimal fuzzy counterparts of scheduling rules, A fuzzy robust scheduling approach for product development projects., USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES, Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters., AN EVOLUTIONARY ALGORITHM FOR PURE FUZZY FLOWSHOP SCHEDULING PROBLEMS, Possibilistic linear programming: A brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem, Fuzzy job shop scheduling with lot-sizing, Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates, Robust scheduling of parallel machines with sequence-dependent set-up costs, A possibilistic approach to sequencing problems with fuzzy parameters, Fuzzy scheduling with application to real-time systems, Survey on fuzzy shop scheduling, Scheduling arrivals to a production system in a fuzzy environment, USING ANT COLONY OPTIMIZATION TO MINIMIZE THE FUZZY MAKESPAN AND TOTAL WEIGHTED FUZZY COMPLETION TIME IN FLOW SHOP SCHEDULING PROBLEMS, Real time task scheduling allowing fuzzy due dates, Fuzzy sets and operations research: Perspectives, A single-machine group schedule with fuzzy setup and processing times, Real-time task scheduling with fuzzy deadlines and processing times, Constructing a fuzzy flow-shop sequencing model based on statistical data, A fuzzy project scheduling approach to minimize schedule risk for product development, The single machine ready time scheduling problem with fuzzy processing times, Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
Cites Work