A fuzzy robust scheduling approach for product development projects.
From MaRDI portal
Publication:1410333
DOI10.1016/S0377-2217(02)00701-4zbMath1044.90038MaRDI QIDQ1410333
Publication date: 14 October 2003
Published in: European Journal of Operational Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Theory of fuzzy sets, etc. (03E72)
Related Items (16)
New strategies for stochastic resource-constrained project scheduling ⋮ A possibilistic decision model for new product supply chain design ⋮ Developing a heuristic algorithm for order production planning using network models under uncertainty conditions ⋮ Coevolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop ⋮ A heuristic method for RCPSP with fuzzy activity times ⋮ Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty ⋮ Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework ⋮ Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks ⋮ Optimal computing budget allocation for ordinal optimization in solving stochastic job shop scheduling problems ⋮ Product concept and prototype flexibility in manufacturing: Implications for customer satisfaction ⋮ New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing ⋮ Disruption management in flight gate scheduling ⋮ Project scheduling under uncertainty: survey and research potentials ⋮ A fuzzy robustness measure for the scheduling of commissioned product development projects ⋮ Modeling and Managing Uncertainty in Process Planning and Scheduling ⋮ Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Ranking fuzzy numbers with integral value.
- Fuzzy multiple attribute decision making. Methods and applications. In collaboration with Frank P. Hwang
- Two scheduling problems with fuzzy due-dates
- A methodology for the reduction of imprecision in the engineering process
- PSPLIB -- a project scheduling problem library
- Ranking and defuzzification methods based on area compensation
- Resource-constrained project scheduling: A survey of recent developments.
- A fuzzy project scheduling approach to minimize schedule risk for product development
- Stochastic and fuzzy PERT
- Recent Developments In Stochastic Activity Networks
- A Review of Production Scheduling
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Search Heuristics for Resource Constrained Project Scheduling
- Solving resource-constrained project scheduling problems by a* search
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
- Qualitative possibility theory and its applications to constraint satisfaction and decision under uncertainty
This page was built for publication: A fuzzy robust scheduling approach for product development projects.