scientific article; zbMATH DE number 3599820
From MaRDI portal
zbMath0385.90076MaRDI QIDQ4166568
Publication date: 1977
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Programming involving graphs or networks (90C35) Introductory exposition (textbooks, tutorial papers, etc.) pertaining to operations research and mathematical programming (90-01)
Related Items
Estimating critical path and arc probabilities in stochastic activity networks, Extremal Probability Bounds in Combinatorial Optimization, Project planning with alternative technologies in uncertain environments, Performance evaluation of a flexible manufacturing cell with random multiproduct feedback flow, The generalized two-sided power distribution, The Architecture of Hierarchy: A Quantitative Approach, On Figures of Merit for Randomly-Shifted Lattice Rules, Algorithms for single-machine scheduling with stochastic outtree precedence relations to minimize expected weighted flow time or maximum expected lateness, Recent advances in temporal analysis of GERT networks, Project scheduling and equipment planning with random breakdowns, New summary measures and datasets for the multi-project scheduling problem, Local search approaches for the test laboratory scheduling problem with variable task grouping, Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks, ANALYSIS OF BENEFITS OF INTEGRATING THE OPPOSITION BASED LEARNING TECHNIQUE INTO NON-DOMINATED SORTING GENETIC ALGORITHM III, Theory and application of reciprocal transformation of “path problem” and “time float problem”, An Approach to the Modeling and Analysis of Software Production Processes, Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology, Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times, A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems, Stochastisches PERT — Eine vergleichende Untersuchung über die Effizienz eines Verfahrens zur stochastischen Projektplanung, A note on the paper Resource-constraint project scheduling: Notation, classification, models and methods by Bruckner et al, Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology, Optimization models for the single delay management problem in public transportation, On path correlation and PERT bias, First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure, Chance-constrained programming in activity networks: A critical evaluation, Single machine scheduling with common due date and controllable processing times, Distribution of the Activity Time in Network Analysis: A Critical Revisit with a Gamma Alternative, Partner selection with a due date constraint in virtual enterprises, A Monte Carlo Technique with Quasirandom Points for the Stochastic Shortest Path Problem, Developing activity duration specification limits for effective project control, A review of the contribution of operational research to project management, Allocation of resources in project management, On the temporal analysis of special GERT networks using a modified Markov renewal process, Sensitivity curves for effective project management, An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains, Algorithms to calculate the distribution of the longest path length of a stochastic activity network with continuous activity durations, Optimization of STEOR networks via Markov renewal programming, Resource-constrained project scheduling by simulated annealing, Unnamed Item, Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem, Optimal distributed execution of join queries, Heuristics for scheduling resource-constrained projects in MPM networks, Schedule-induced posets, On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations, Scheduling tasks on two processors with deadlines and additional resources, Resource allocation via dynamic programming in activity networks, A revised critical path method for networks including both overlap relationships and variable-duration activities, Approximating the distribution functions in stochastic networks, Risk taking in stochastic PERT networks, Incorporating processor costs in optimizing the distributed execution of join queries, A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing, MIP models for resource-constrained project scheduling with flexible resource profiles, The most critical path in a PERT network: A heuristic approach, A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs, Computing project makespan distributions: Markovian PERT networks revisited, Optimal crashing of an activity network with disruptions, Integration of equipment planning and project scheduling, Single machine scheduling problems with controllable processing times and total absolute differences penalties, Multiple asymmetric traveling salesmen problem with and without precedence constraints: performance comparison of alternative formulations, Controlled alternative activity networks for project management, Minimizing the response time of executing a join between fragmented relations in a distributed database system, Modelling and solving generalised operational surgery scheduling problems, Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production, Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP), The knapsack problem with generalized upper bounds, Genetic algorithms in constrained optimization, A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network, Scheduling of design projects with uncertain number of iterations, Periodic network optimization with different arc frequencies, Concurrent visual search and time reproduction with cross-talk, An intelligent interactive project management support system, The discrete time-cost tradeoff problem revisited, Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem, Activity nets: A guided tour through some recent developments, Parallel \(N\)-free order recognition, Project scheduling with finite or infinite number of activity processing modes -- a survey, Sensitivity analysis of ranked data: from order statistics to quantiles, On the measurement of complexity in activity networks, Sensitivity estimation for Gaussian systems, Resource-constrained project scheduling: A survey of recent developments., Criticality analysis of activity networks under interval uncertainty, A fuzzy robust scheduling approach for product development projects., Scheduling of project networks, A new approach to determine the critical path in stochastic activity network, Solving the resource-constrained project scheduling problem by a variable neighbourhood search., Optimal paths in bi-attribute networks with fractional cost functions, A multi-objective approach to resource allocation in single machine scheduling, The project scheduling problem with irregular starting time costs, A new approximation algorithm for obtaining the probability distribution function for project completion time, A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags, An evaluation of the adequacy of project network generators with systematically sampled networks, Estimating tail probabilities of heavy tailed distributions with asymptotically zero relative error, A heuristic procedure for solving the dynamic probabilistic project expediting problem, A local search framework for industrial test laboratory scheduling, Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem, A random generator of resource-constrained multi-project network problems, An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances, Single-machine scheduling to minimize total convex resource consumption with a constraint on total weighted flow time, New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing, A hybrid framework for over-constrained generalized resource-constrained project scheduling problems, A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem, Scheduling Markovian PERT networks to maximize the net present value, A solution approach to find the critical path in a time-constrained activity network, Benders decomposition, Lagrangean relaxation and metaheuristic design, Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods), Stochastic networks and the extreme value distribution, Some efficient multi-heuristic procedures for resource-constrained project scheduling, Project bidding under deterministic and probabilistic activity durations, The scheduling of activities to maximize the net present value of projects, Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems, A survey of variants and extensions of the resource-constrained project scheduling problem, An optimal procedure for the single-model deterministic assembly line balancing problem, Stochastic gradient-based time-cost tradeoffs in PERT networks using simulation, The risk of delay of a project in terms of the morphology of its network, Resource-constrained project scheduling: Notation, classification, models, and methods, The multi-mode resource-constrained project scheduling problem with generalized precedence relations, Multimode resource-constrained project scheduling in flexible projects, Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty, An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations, Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation, A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes, The use of cutsets in Monte Carlo analysis of stochastic networks, Structured construction and simulation of nondeterministic stochastic activity networks, Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows, Audit scheduling with overlapping activities and sequence-dependent setup costs, Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities, Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application, A model to optimize project resource allocation by construction of a balanced histogram, On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems, A priority-rule method for project scheduling with work-content constraints, Optimal control policies for resource allocation in an activity network, Preemptive scheduling of independent jobs on parallel machines subject to financial constraints, A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations, On criticality and sensitivity in activity networks, A compact hash function for paths in PERT networks, An upper bound on the expected completion time of PERT networks, A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags, Aggregation of dispersed consequences for constructing criteria: The evaluation of flood risk reduction strategies, Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise