MIP models for resource-constrained project scheduling with flexible resource profiles

From MaRDI portal
Publication:297247

DOI10.1016/j.ejor.2014.05.036zbMath1339.90249OpenAlexW1971723694MaRDI QIDQ297247

Rainer Kolisch, Anulark Naber

Publication date: 24 June 2016

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2014.05.036



Related Items

A rough-cut capacity planning model with overlapping, Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions, Resource loading with time windows, Scheduling resource-constrained projects with a flexible project structure, Resource-constrained project scheduling with flexible resource profiles in continuous time, A polyhedral study of event-based models for the resource-constrained project scheduling problem, Optimizing temporary work and overtime in the time cost quality trade-off problem, Benders decomposition for a period-aggregated resource leveling problem with variable job duration, A hybrid exact method for a scheduling problem with a continuous resource and energy constraints, Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource, Resource constrained routing and scheduling: review and research prospects, The parcel hub scheduling problem with limited conveyor capacity and controllable unloading speeds, Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem, An updated survey of variants and extensions of the resource-constrained project scheduling problem, Integer programming models for mid-term production planning for high-tech low-volume supply chains, A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles, Scheduling medical residents' training at university hospitals, Revenue sharing for resource transfer among projects, Maximising the weighted number of activity execution modes in project planning, Model and algorithm for human resource-constrained R\&D program scheduling optimization, Polyhedral Results and Branch-and-Cut for the Resource Loading Problem



Cites Work