A rough-cut capacity planning model with overlapping
From MaRDI portal
Publication:280165
DOI10.1007/s00291-016-0436-0zbMath1339.90017OpenAlexW2284538595MaRDI QIDQ280165
Alain Haït, Guillaume Bouvignies, Georges Baydoun, Bernard Clément, Robert Pellerin
Publication date: 4 May 2016
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-016-0436-0
Related Items (4)
Editorial ``Project management and scheduling ⋮ Benders decomposition for a period-aggregated resource leveling problem with variable job duration ⋮ An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem
Cites Work
- MIP models for resource-constrained project scheduling with flexible resource profiles
- A cutting plane approach for integrated planning and scheduling
- A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Unnamed Item
This page was built for publication: A rough-cut capacity planning model with overlapping