A priority-rule method for project scheduling with work-content constraints

From MaRDI portal
Publication:1046055

DOI10.1016/j.ejor.2009.09.019zbMath1177.90158OpenAlexW2010633352MaRDI QIDQ1046055

C.-U. Fündeling, Norbert Trautmann

Publication date: 21 December 2009

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2009.09.019




Related Items (17)

Resource levelling in project scheduling with generalized precedence relationships and variable execution intensitiesEnergetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functionsMIP models for resource-constrained project scheduling with flexible resource profilesResource loading with time windowsResource-constrained project scheduling with flexible resource profiles in continuous timeOptimizing temporary work and overtime in the time cost quality trade-off problemBenders decomposition for a period-aggregated resource leveling problem with variable job durationA hybrid exact method for a scheduling problem with a continuous resource and energy constraintsProject scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resourcePolyhedral results and valid inequalities for the continuous energy-constrained scheduling problemAn updated survey of variants and extensions of the resource-constrained project scheduling problemA hybrid metaheuristic for resource-constrained project scheduling with flexible resource profilesA unified view of parallel machine scheduling with interdependent processing ratesRailway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environmentPolyhedral Results and Branch-and-Cut for the Resource Loading ProblemA tree search heuristic for the resource constrained project scheduling problem with transfer timesEnergetic reasoning for energy-constrained scheduling with a continuous resource


Uses Software


Cites Work


This page was built for publication: A priority-rule method for project scheduling with work-content constraints