A hybrid genetic algorithm for the resource-constrained project scheduling problem

From MaRDI portal
Publication:2455614

DOI10.1016/j.ejor.2006.12.033zbMath1137.90526OpenAlexW2054234206MaRDI QIDQ2455614

Vicente Valls, Francisco Ballestín, M. Sacramento Quintanilla

Publication date: 25 October 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2006.12.033



Related Items

A genetic algorithm for the robust resource leveling problem, Scheduling resource-constrained projects with a flexible project structure, An approach using SAT solvers for the RCPSP with logical constraints, A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling, Genetic algorithm for the resource-constrained project scheduling problem, Going to the core of hard resource-constrained project scheduling instances, An evolutionary approach for resource constrained project scheduling with uncertain changes, Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources, An Improved Genetic Algorithm for the Resource-Constrained Project Scheduling Problem, Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers, Unnamed Item, A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations, An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags, A fuzzy time-dependent project scheduling problem, Resource tardiness weighted cost minimization in project scheduling, Towards merging binary integer programming techniques with genetic algorithms, Integrated scheduling and batch ordering for construction project, Resource-constrained project scheduling with activity splitting and setup times, An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem, New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing, A neurogenetic approach for the resource-constrained project scheduling problem, Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times, Scheduling projects with limited number of preemptions, A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem, Activity list representation for a generalization of the resource-constrained project scheduling problem, A priority-rule method for project scheduling with work-content constraints, A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software


Cites Work