A competitive heuristic solution technique for resource-constrained project scheduling

From MaRDI portal
Publication:5948195

DOI10.1023/A:1010997814183zbMath1024.90045OpenAlexW193608259MaRDI QIDQ5948195

Pilar Tormos, Antonio Lova

Publication date: 31 October 2001

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1023/a:1010997814183




Related Items (28)

A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problemModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsExperimental investigation of heuristics for resource-constrained project scheduling: an updateGenetic algorithm for the resource-constrained project scheduling problemR\&D pipeline management: task interdependencies and risk managementA lexicographic approach to the robust resource-constrained project scheduling problemA fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction projectConsidering project management activities for engineering design groupsA hybrid genetic algorithm for the resource-constrained project scheduling problemA random key based genetic algorithm for the resource constrained project scheduling problemRevenue sharing for resource reallocation among project activity contractorsTowards merging binary integer programming techniques with genetic algorithmsTime symmetry of resource constrained project scheduling with general temporal constraints and take-give resourcesMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesNeuroGenetic approach for combinatorial optimization: an exploratory analysisA double genetic algorithm for the MRCPSP/maxA neurogenetic approach for the resource-constrained project scheduling problemJustification and RCPSP: a technique that paysA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemProject selection, scheduling and resource allocation with time dependent returnsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingAn efficient multi-pass heuristic for project scheduling with constrained resourcesScheduling projects with limited number of preemptionsA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemActivity list representation for a generalization of the resource-constrained project scheduling problemA competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software



This page was built for publication: A competitive heuristic solution technique for resource-constrained project scheduling