An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances

From MaRDI portal
Publication:2256244

DOI10.1016/j.ejor.2013.10.012zbMath1305.90203OpenAlexW1978134557MaRDI QIDQ2256244

Vincent Van Peteghem, Mario Vanhoucke

Publication date: 19 February 2015

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2013.10.012




Related Items (28)

Meta-heuristic solution with considering setup time for multi-skilled project scheduling problemA heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraintsMulti-mode resource constrained multi-project scheduling and resource portfolio problemA column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resourceScheduling resource-constrained projects with a flexible project structureAn approach using SAT solvers for the RCPSP with logical constraintsA path-relinking algorithm for the multi-mode resource-constrained project scheduling problemMultimode time-cost-robustness trade-off project scheduling problem under uncertaintyImpacts of synergies on software project schedulingMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicA data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problemResource constrained routing and scheduling: review and research prospectsContinuous-time formulations for multi-mode project schedulingThe multi-mode resource investment problem: a benchmark library and a computational study of lower and upper boundsMulti-attribute assignment of trains to departures in rolling stock management. Multi-attribute assignment of trains to departures in rolling stock management. A contribution to the EURO/ROADEF 2014 challengeAn updated survey of variants and extensions of the resource-constrained project scheduling problemMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemA hybrid metaheuristic for resource-constrained project scheduling with flexible resource profilesUsing schedule risk analysis with resource constraints for project controlA modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splittingStochastic project scheduling with hierarchical alternativesModel and algorithm for human resource-constrained R\&D program scheduling optimizationMultimode resource-constrained project scheduling in flexible projectsAn innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrainsStrong bounds for resource constrained project scheduling: preprocessing and cutting planesPersonnel scheduling and supplies provisioning in emergency relief operationsSolving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms


Uses Software


Cites Work




This page was built for publication: An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances