Model and algorithm for human resource-constrained R\&D program scheduling optimization
Summary: In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R\&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.
- Multi-objective human resources allocation in R&D projects planning
- Competence-driven project portfolio selection, scheduling and staff assignment
- Project scheduling with flexible resources: formulation and inequalities
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- Modeling of and algorithm for resource-constrained project scheduling problem with resource allocation dependent processing time
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles
- A two-stage algorithm for a project scheduling problem with multi-skilled workforce constraints
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Methods to solve multi-skill project scheduling problem
- MIP models for resource-constrained project scheduling with flexible resource profiles
- PSPLIB -- a project scheduling problem library
- Scheduling and staffing multiple projects with a multi-skilled workforce
- The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem