Model and algorithm for human resource-constrained R\&D program scheduling optimization (Q2296461)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7168894
Language Label Description Also known as
default for all languages
No label defined
    English
    Model and algorithm for human resource-constrained R\&D program scheduling optimization
    scientific article; zbMATH DE number 7168894

      Statements

      Model and algorithm for human resource-constrained R\&D program scheduling optimization (English)
      0 references
      0 references
      0 references
      0 references
      0 references
      0 references
      18 February 2020
      0 references
      Summary: In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R\&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.
      0 references

      Identifiers