PSPLIB -- a project scheduling problem library
From MaRDI portal
Recommendations
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
- New summary measures and datasets for the multi-project scheduling problem
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
Cites work
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Adaptive search for solving hard project scheduling problems
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 1175392 (Why is no real title available?)
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling
- ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS
- On the use of the complexity index as a measure of complexity in activity networks
- Problem space search algorithms for resource-constrained project scheduling
- Project Scheduling with Discrete and Continuous Resources
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Scheduling of project networks
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Solving the resource constrained project scheduling problem with optimization subroutine library
- The payment scheduling problem
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
Cited in
(only showing first 100 items - show all)- Evaluating project completion time in project networks with discrete random activity durations
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Simulated annealing and tabu search for multi-mode project payment scheduling
- A priority-rule method for project scheduling with work-content constraints
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- PSPLIB
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Lower bounds for resource-constrained project scheduling problems.
- On linear lower bounds for the resource constrained project scheduling problem.
- Resource-constrained project scheduling: A survey of recent developments.
- A fuzzy robust scheduling approach for product development projects.
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search.
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
- A linear programming and constraint propagation-based lower bound for the RCPSP
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG
- New strategies for stochastic resource-constrained project scheduling
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- Computing project makespan distributions: Markovian PERT networks revisited
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
- A branch and bound algorithm for project scheduling problem with spatial resource constraints
- Redundant cumulative constraints to compute preemptive bounds
- Lower bounds for the event scheduling problem with consumption and production of resources
- Optimal workforce assignment to operations of a paced assembly line
- An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem
- An efficient particle swarm optimizer with application to man-day project scheduling problems
- A new approach to determine the critical path in stochastic activity network
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
- The preemptive stochastic resource-constrained project scheduling problem
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling
- Resource tardiness weighted cost minimization in project scheduling
- Towards merging binary integer programming techniques with genetic algorithms
- Optimizing version release dates of research and development long-term processes
- An effective heuristic for project scheduling with resource availability cost
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems
- A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- On the generation of circuits and minimal forbidden sets
- Project scheduling under uncertainty: survey and research potentials
- Justification and RCPSP: a technique that pays
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP
- Using metaheuristics in multiobjective resource constrained project scheduling
- Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems
- Integrated scheduling and batch ordering for construction project
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem
- Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem
- Revenue sharing for resource transfer among projects
- Using schedule risk analysis with resource constraints for project control
- A distributionally robust analysis of the program evaluation and review technique
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- A fuzzy robustness measure for the scheduling of commissioned product development projects
- Two-bar charts packing problem
- SAT encodings for pseudo-Boolean constraints together with at-most-one constraints
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers
- A tree search heuristic for the resource constrained project scheduling problem with transfer times
- A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
- Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag
- A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
- On the integration of diverging material flows into resource-constrained project scheduling
- A polyhedral study of event-based models for the resource-constrained project scheduling problem
- Optimizing temporary work and overtime in the time cost quality trade-off problem
- Using the generalized maximum covering location model to control a project's progress
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds
- Considering project management activities for engineering design groups
- Negotiation mechanisms for the multi-agent multi-mode resource investment problem
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities
- Metaheuristics for multi-mode capital-constrained project payment scheduling
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- A solution approach to find the critical path in a time-constrained activity network
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- Proactive policies for the stochastic resource-constrained project scheduling problem
- The proactive and reactive resource-constrained project scheduling problem
- Utility distribution strategy of the task agents in coalition skill games
- Model and algorithm for human resource-constrained R\&D program scheduling optimization
- Multimode resource-constrained project scheduling in flexible projects
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
- Strong bounds for resource constrained project scheduling: preprocessing and cutting planes
- A quadratic edge-finding filtering algorithm for cumulative resource constraints
- Synchronized sweep algorithms for scalable scheduling constraints
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
- A cumulative not-first/not-last filtering algorithm in \(O(n^2 \log(n))\)
- Genetic algorithm for the resource-constrained project scheduling problem
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
This page was built for publication: PSPLIB -- a project scheduling problem library
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1278481)