A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
From MaRDI portal
Recommendations
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- A branch-and-bound algorithm for the resource-constrained project scheduling problem
- A multiple-tree search procedure for the resource-constrained project scheduling problem
Cited in
(only showing first 100 items - show all)- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
- A branch-and-bound algorithm for RCPSP with variable resource requirements and variable multiple resource availability constraints
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Scatter search for project scheduling with resource availability cost
- A random generator of resource-constrained multi-project network problems
- A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment
- Scattered branch and bound. An adaptive search strategy applied to resource-constrained project scheduling
- Reducing the feasible solution space of resource-constrained project instances
- An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply
- Activity list representation for a generalization of the resource-constrained project scheduling problem
- Heuristic approaches for a multi-mode resource availability cost problem in aircraft manufacturing
- A Multiobjective Resource-Constrained Project-Scheduling Problem
- Surrogate-assisted cooperative learning genetic programming for the resource-constrained project scheduling problem with stochastic activity durations and transfer times
- A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem
- Resource-constrained project scheduling with activity splitting and setup times
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
- A matheuristic for the resource-constrained project scheduling problem
- A robust multi-project scheduling problem under a resource dedication-transfer policy
- Considering project management activities for engineering design groups
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- Activity consolidation to improve responsiveness
- A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce
- A multiple-tree search procedure for the resource-constrained project scheduling problem
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- New representation to reduce the search space for the resource-constrained project scheduling problem
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
- An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
- Minimizing the total weighted late work in scheduling of identical parallel processors with communication delays
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models
- Insertion algorithms with justification for solving the resource-constrained project scheduling
- Scheduling resource-constrained projects using branch-and-bound and parallel computing techniques
- Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints.
- On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problem
- Scheduling of design projects with uncertain number of iterations
- A branch-and-bound algorithm for scheduling of new product development projects
- An effective heuristic for project scheduling with resource availability cost
- A fuzzy robust scheduling approach for product development projects.
- Genetic algorithm for the resource-constrained project scheduling problem
- A classification of predictive-reactive project scheduling procedures
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
- A quantitative approach for scheduling activities to reduce set-up in multiple machine lines
- An exact depth-first algorithm for the pallet loading problem
- Modelling setup times, process batches and transfer batches using activity network logic
- A MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm
- The interaction between critical chain sequencing, buffer sizing, and reactive actions in a CC/BM framework
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- A fuzzy project scheduling approach to minimize schedule risk for product development
- A hybrid framework for over-constrained generalized resource-constrained project scheduling problems
- Revenue sharing for resource transfer among projects
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Practical solutions for a dock assignment problem with trailer transportation
- Activity nets: A guided tour through some recent developments
- A branch-and-bound algorithm for the resource-constrained project scheduling problem
- Resource-constrained project scheduling: A survey of recent developments.
- The multiple resource constrained project scheduling problem: A breadth-first approach
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- An exact algorithm for minimizing resource availability costs in project scheduling
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
- A comparison of stochastic scheduling rules for maximizing project net present value
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements
- Scheduling and constraint propagation
- Reactive scheduling in the multi-mode RCPSP
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- On the use of the complexity index as a measure of complexity in activity networks
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- New concepts for activity float in resource-constrained project management
- Optimization analysis for design and planning of multi-project programs
- A new search procedure for the two-dimensional orthogonal packing problem
- An exact dynamic programming algorithm for the precedence-constrained class sequencing problem
- Going to the core of hard resource-constrained project scheduling instances
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- A branch and bound algorithm for project scheduling problem with spatial resource constraints
- A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties
- New summary measures and datasets for the multi-project scheduling problem
- Fifty years of research on resource-constrained project scheduling explored from different perspectives
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
- Improved parameterized algorithms for scheduling with precedence constraints and time windows
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
- Project network models with discounted cash flows a guided tour through recent developments
- Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Proactive policies for the stochastic resource-constrained project scheduling problem
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
This page was built for publication: A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4032492)