Optimization analysis for design and planning of multi-project programs
From MaRDI portal
Publication:1296112
Recommendations
- Dynamic and stochastic multi-project planning
- scientific article; zbMATH DE number 3876908
- scientific article; zbMATH DE number 3980891
- scientific article; zbMATH DE number 3887412
- Chance constrained programming models for optimization of project schemes
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems
- Constrained multi-project planning problems: A Lagrangean decomposition approach
- Decision support for project portfolio planning with multiple objectives
- Interactive analysis of multiple-criteria project scheduling problems
- Optimizing the selection and scheduling of multi-class projects using a Stackelberg framework
Cites work
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A decomposition approach to multi-project scheduling
- Capacity planning in manufacturing networks with discrete options
- Constrained multi-project planning problems: A Lagrangean decomposition approach
- Critical-Path Planning and Scheduling: Mathematical Basis
- Decomposition Principle for Linear Programs
- scientific article; zbMATH DE number 3356467 (Why is no real title available?)
- On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problem
- Parallel computation of large-scale dynamic market network equilibria via time period decomposition
Cited in
(7)- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- A genetic algorithm for the resource constrained multi-project scheduling problem
- Programmatic Risk Analysis for Critical Engineering Systems Under Tight Resource Constraints
- scientific article; zbMATH DE number 3914060 (Why is no real title available?)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm
- Maximising the weighted number of activity execution modes in project planning
This page was built for publication: Optimization analysis for design and planning of multi-project programs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1296112)