A genetic algorithm for the resource constrained multi-project scheduling problem
From MaRDI portal
Publication:2482793
DOI10.1016/j.ejor.2006.06.074zbMath1146.90412OpenAlexW2070975460MaRDI QIDQ2482793
Mauricio G. C. Resende, J. J. M. Mendes, José Fernando Gonçalves
Publication date: 24 April 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.074
Related Items
In and out forests on combinatorial landscapes ⋮ A biased random-key genetic algorithm for the unequal area facility layout problem ⋮ Scheduling resource-constrained projects with a flexible project structure ⋮ Resource allocation in multi-class dynamic PERT networks with finite capacity ⋮ A multi-population hybrid biased random key genetic algorithm for hop-constrained trees in nonlinear cost flow networks ⋮ A biased random-key genetic algorithm for the project scheduling problem with flexible resources ⋮ New summary measures and datasets for the multi-project scheduling problem ⋮ Integrated multi-project planning and scheduling -- a multiagent approach ⋮ A MIP model and a biased random-key genetic algorithm based approach for a two-dimensional cutting problem with defects ⋮ Biased random-key genetic algorithms with applications in telecommunications ⋮ A hybrid biased random key genetic algorithm approach for the unit commitment problem ⋮ Local search approaches for the test laboratory scheduling problem with variable task grouping ⋮ Statistical design of genetic algorithms for combinatorial optimization problems ⋮ Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates ⋮ Resource-constrained multi-project scheduling problem: a survey ⋮ A quantum-inspired vortex search algorithm with application to function optimization ⋮ Resource allocation in dynamic PERT networks with finite capacity ⋮ A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling ⋮ Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm ⋮ Harmony search algorithm with dynamic control parameters ⋮ A multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problem ⋮ A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization ⋮ An integer linear programming formulation and heuristics for the minmax relative regret robust shortest path problem ⋮ Multi-project scheduling with two-stage decomposition ⋮ A fuzzy time-dependent project scheduling problem ⋮ A local search framework for industrial test laboratory scheduling ⋮ A parallel multi-population biased random-key genetic algorithm for a container loading problem ⋮ A learning-based optimization approach to multi-project scheduling ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A biased random-key genetic algorithm for the minimization of open stacks problem ⋮ GEM: A novel evolutionary optimization method with improved neighborhood search ⋮ A hybrid thermostatted kinetic framework for the modeling of a hybrid multisource system with storage ⋮ A priority-rule method for project scheduling with work-content constraints ⋮ A Genetic Algorithm for Scheduling Alternative Tasks Subject to Technical Failure ⋮ Multi-objective optimization method for learning thresholds in a decision-theoretic rough set model ⋮ Workforce routing and scheduling for electricity network maintenance with downtime minimization ⋮ Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- A decomposition approach to multi-project scheduling
- Scheduling subject to resource constraints: Classification and complexity
- Optimization analysis for design and planning of multi-project programs
- Constrained multi-project planning problems: A Lagrangean decomposition approach
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- A genetic algorithm for the weight setting problem in OSPF routing
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
- A hybrid genetic algorithm for the job shop scheduling problem
- Scheduling of Project Networks by Job Assignment
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Genetic Algorithms and Random Keys for Sequencing and Optimization
- A hybrid genetic algorithm for the weight setting problem in OSPF/IS‐IS routing