A genetic algorithm for the resource constrained multi-project scheduling problem

From MaRDI portal
Publication:2482793

DOI10.1016/j.ejor.2006.06.074zbMath1146.90412OpenAlexW2070975460MaRDI QIDQ2482793

Mauricio G. C. Resende, J. J. M. Mendes, José Fernando Gonçalves

Publication date: 24 April 2008

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.074



Related Items

In and out forests on combinatorial landscapesA biased random-key genetic algorithm for the unequal area facility layout problemScheduling resource-constrained projects with a flexible project structureResource allocation in multi-class dynamic PERT networks with finite capacityA multi-population hybrid biased random key genetic algorithm for hop-constrained trees in nonlinear cost flow networksA biased random-key genetic algorithm for the project scheduling problem with flexible resourcesNew summary measures and datasets for the multi-project scheduling problemIntegrated multi-project planning and scheduling -- a multiagent approachA MIP model and a biased random-key genetic algorithm based approach for a two-dimensional cutting problem with defectsBiased random-key genetic algorithms with applications in telecommunicationsA hybrid biased random key genetic algorithm approach for the unit commitment problemLocal search approaches for the test laboratory scheduling problem with variable task groupingStatistical design of genetic algorithms for combinatorial optimization problemsMulti-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due datesResource-constrained multi-project scheduling problem: a surveyA quantum-inspired vortex search algorithm with application to function optimizationResource allocation in dynamic PERT networks with finite capacityA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingSimplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithmHarmony search algorithm with dynamic control parametersA multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problemA dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimizationAn integer linear programming formulation and heuristics for the minmax relative regret robust shortest path problemMulti-project scheduling with two-stage decompositionA fuzzy time-dependent project scheduling problemA local search framework for industrial test laboratory schedulingA parallel multi-population biased random-key genetic algorithm for a container loading problemA learning-based optimization approach to multi-project schedulingA survey of variants and extensions of the resource-constrained project scheduling problemA biased random-key genetic algorithm for the minimization of open stacks problemGEM: A novel evolutionary optimization method with improved neighborhood searchA hybrid thermostatted kinetic framework for the modeling of a hybrid multisource system with storageA priority-rule method for project scheduling with work-content constraintsA Genetic Algorithm for Scheduling Alternative Tasks Subject to Technical FailureMulti-objective optimization method for learning thresholds in a decision-theoretic rough set modelWorkforce routing and scheduling for electricity network maintenance with downtime minimizationSolving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms


Uses Software


Cites Work