A random key based genetic algorithm for the resource constrained project scheduling problem
From MaRDI portal
Publication:947946
DOI10.1016/j.cor.2007.07.001zbMath1163.90500OpenAlexW2062975634MaRDI QIDQ947946
J. J. M. Mendes, José Fernando Gonçalves, Mauricio G. C. Resende
Publication date: 8 October 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10400.22/4520
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem, A biased random-key genetic algorithm for the unequal area facility layout problem, Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP, A biased random-key genetic algorithm for the capacitated minimum spanning tree problem, Optimal configuration of power distribution networks with variable renewable energy resources, Scheduling parallel-machine batch operations to maximize on-time delivery performance, A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling, Genetic algorithm for the resource-constrained project scheduling problem, Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP), A biased random-key genetic algorithm for the project scheduling problem with flexible resources, An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case, Biased random-key genetic algorithms with applications in telecommunications, An Improved Genetic Algorithm for the Resource-Constrained Project Scheduling Problem, The parcel hub scheduling problem with limited conveyor capacity and controllable unloading speeds, Unnamed Item, An integer linear programming formulation and heuristics for the minmax relative regret robust shortest path problem, Towards merging binary integer programming techniques with genetic algorithms, An extended Akers graphical method with a biased random‐key genetic algorithm for job‐shop scheduling, An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem, An effective genetic algorithm for network coding, Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem, A survey of hybrid metaheuristics for the resource-constrained project scheduling problem, Computing minimal doubly resolving sets of graphs, Activity list representation for a generalization of the resource-constrained project scheduling problem, Resource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities, A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
- A population-based approach to the resource-constrained project scheduling problem
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Scheduling subject to resource constraints: Classification and complexity
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- A tabu search approach for the resource constrained project scheduling problem
- A branch and bound algorithm for the resource-constrained project scheduling problem
- DSS for multiobjective project scheduling
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Lower bounds for resource-constrained project scheduling problems.
- PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search.
- A linear programming and constraint propagation-based lower bound for the RCPSP
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- On the generation of circuits and minimal forbidden sets
- Justification and RCPSP: a technique that pays
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Experience with fine-grained parallel genetic algorithms
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- Scattered branch and bound. An adaptive search strategy applied to resource-constrained project scheduling
- A hybrid genetic algorithm for the job shop scheduling problem
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- A hybrid genetic algorithm-heuristic for a two-dimensional orthogonal packing problem
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem
- Solving Project Scheduling Problems by Minimum Cut Computations
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- Complex Scheduling
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Resource-constrained project scheduling by simulated annealing
- Genetic Algorithms and Random Keys for Sequencing and Optimization
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- An efficient multi-pass heuristic for project scheduling with constrained resources
- Search Heuristics for Resource Constrained Project Scheduling
- A self-adapting genetic algorithm for project scheduling under resource constraints
- A hybrid genetic algorithm for the weight setting problem in OSPF/IS‐IS routing
- Adaptive search for solving hard project scheduling problems
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- A competitive heuristic solution technique for resource-constrained project scheduling