A random key based genetic algorithm for the resource constrained project scheduling problem

From MaRDI portal
Publication:947946

DOI10.1016/j.cor.2007.07.001zbMath1163.90500OpenAlexW2062975634MaRDI QIDQ947946

J. J. M. Mendes, José Fernando Gonçalves, Mauricio G. C. Resende

Publication date: 8 October 2008

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: http://hdl.handle.net/10400.22/4520



Related Items

A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem, A biased random-key genetic algorithm for the unequal area facility layout problem, Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP, A biased random-key genetic algorithm for the capacitated minimum spanning tree problem, Optimal configuration of power distribution networks with variable renewable energy resources, Scheduling parallel-machine batch operations to maximize on-time delivery performance, A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling, Genetic algorithm for the resource-constrained project scheduling problem, Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP), A biased random-key genetic algorithm for the project scheduling problem with flexible resources, An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case, Biased random-key genetic algorithms with applications in telecommunications, An Improved Genetic Algorithm for the Resource-Constrained Project Scheduling Problem, The parcel hub scheduling problem with limited conveyor capacity and controllable unloading speeds, Unnamed Item, An integer linear programming formulation and heuristics for the minmax relative regret robust shortest path problem, Towards merging binary integer programming techniques with genetic algorithms, An extended Akers graphical method with a biased random‐key genetic algorithm for job‐shop scheduling, An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem, An effective genetic algorithm for network coding, Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem, A survey of hybrid metaheuristics for the resource-constrained project scheduling problem, Computing minimal doubly resolving sets of graphs, Activity list representation for a generalization of the resource-constrained project scheduling problem, Resource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities, A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software


Cites Work