scientific article; zbMATH DE number 2047436
From MaRDI portal
Publication:4451582
zbMATH Open1042.90022MaRDI QIDQ4451582FDOQ4451582
Publication date: 29 February 2004
Title of this publication is not available (Why is that?)
Recommendations
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search.
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic
- A variable neighborhood tabu search algorithm for project robust scheduling problems
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling
- A variable neighbourhood search algorithm for the constrained task allocation problem
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- Resource constrained project scheduling: a hybrid neural approach
Programming involving graphs or networks (90C35) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)
Cited In (18)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem
- Genetic algorithm for the resource-constrained project scheduling problem
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- A random key based genetic algorithm for the resource constrained project scheduling problem
- A variable neighbourhood search algorithm for the constrained task allocation problem
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- Project selection, scheduling and resource allocation with time dependent returns
- Some algorithms of solving minimax multiprocessor scheduling problem
- Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search.
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- A hybrid metaheuristic for the resource-constrained project scheduling problem
Uses Software
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4451582)