An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
From MaRDI portal
Recommendations
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
- Population learning algorithm for the resource-constrained project scheduling
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation
- A modified ant colony algorithm for solving resource-constrained project scheduling problem
- A population-based approach to the resource-constrained project scheduling problem
Cites work
- scientific article; zbMATH DE number 3580247 (Why is no real title available?)
- scientific article; zbMATH DE number 1300399 (Why is no real title available?)
- scientific article; zbMATH DE number 2047436 (Why is no real title available?)
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- A neurogenetic approach for the resource-constrained project scheduling problem
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- A random key based genetic algorithm for the resource constrained project scheduling problem
- A robust genetic algorithm for resource allocation in project scheduling
- A self-adapting genetic algorithm for project scheduling under resource constraints
- A simulated annealing algorithm for resource constrained project scheduling problems
- Adaptive search for solving hard project scheduling problems
- An investigation into the relationship of heuristic performance with network-resource characteristics
- An iterative scheduling technique for resource-constrained project scheduling
- Case-based reasoning and improved adaptive search for project scheduling
- Formulation and tabu search algorithm for the resource constrained project scheduling problem.
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- PSPLIB -- a project scheduling problem library
- Project scheduling under limited resources. Models, methods, and applications
- Project scheduling with time-varying resource constraints
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling of Project Networks by Job Assignment
- Scheduling subject to resource constraints: Classification and complexity
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Tabu search in audit scheduling
Cited in
(18)- Improved bat algorithm for project resource balance under generalized priority relation constraint
- scientific article; zbMATH DE number 7656034 (Why is no real title available?)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective
- A diversified shuffled frog leaping: an application for parameter identification
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
- Multi-mode resource availability cost problem with recruitment and release dates for resources
- An Improved Genetic Algorithm for the Resource-Constrained Project Scheduling Problem
- Multi-project scheduling and material ordering with time varying supplier capacities
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure
- Iterative Flattening Search on RCPSP/max Problems: Recent Developments
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling
- Minimizing total weighted late work in the resource-constrained project scheduling problem
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems
- Population learning algorithm for the resource-constrained project scheduling
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- An improved shuffled frog-leaping algorithm for flexible job shop scheduling problem
This page was built for publication: An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1762055)