An iterative scheduling technique for resource-constrained project scheduling

From MaRDI portal
Publication:1197942

DOI10.1016/0377-2217(92)90320-9zbMath0825.90536OpenAlexW1981525734MaRDI QIDQ1197942

S. Singh

Publication date: 16 January 1993

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(92)90320-9




Related Items (45)

New strategies for stochastic resource-constrained project schedulingA scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flowsA polarized adaptive schedule generation scheme for the resource-constrained project scheduling problemA local constraint based analysis approach to project scheduling under general resource constraintsA tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphsAn approach using SAT solvers for the RCPSP with logical constraintsIntegration of electromagnetism with multi-objective evolutionary algorithms for RCPSPAn effective shaking procedure for 2D and 3D strip packing problemsExperimental investigation of heuristics for resource-constrained project scheduling: an updateA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingA biased random-key genetic algorithm for the project scheduling problem with flexible resourcesGoing to the core of hard resource-constrained project scheduling instancesProject scheduling with finite or infinite number of activity processing modes -- a surveyResource-constrained project scheduling: A critical activity reordering heuristicMulti-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due datesNew resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithmsMulti-mode resource-constrained project scheduling using RCPSP and SAT solversA hybrid metaheuristic for the resource-constrained project scheduling problemAn effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problemA hybrid genetic algorithm for the resource-constrained project scheduling problemTowards merging binary integer programming techniques with genetic algorithmsTime symmetry of resource constrained project scheduling with general temporal constraints and take-give resourcesCapital- and resource-constrained project scheduling with net present value optimizationAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemResource-constrained project scheduling with activity splitting and setup timesAn effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingA constraint-based perspective in resource constrained project schedulingA neurogenetic approach for the resource-constrained project scheduling problemJustification and RCPSP: a technique that paysA learning-based optimization approach to multi-project schedulingA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemA new algorithm for resource-constrained project scheduling with breadth and depth of skillsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingSerial and parallel resource-constrained project scheduling methods revisited: Theory and computationA note on an iterative forward/backward scheduling technique with reference to a procedure by Li and WillisAn efficient multi-pass heuristic for project scheduling with constrained resourcesA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemActivity list representation for a generalization of the resource-constrained project scheduling problemBidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projectsA hybrid scatter search/electromagnetism meta-heuristic for project schedulingUsing tabu search to schedule activities of stochastic resource-constrained projectsExperimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problemA multicriteria heuristic method to improve resource allocation in multiproject schedulingA competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem



Cites Work


This page was built for publication: An iterative scheduling technique for resource-constrained project scheduling