Resource-constrained project scheduling: A critical activity reordering heuristic

From MaRDI portal
Publication:1399574

DOI10.1016/S0377-2217(02)00768-3zbMath1032.90011MaRDI QIDQ1399574

Francisco Ballestín, Vicente Valls, M. Sacramento Quintanilla

Publication date: 30 July 2003

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (28)

A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flowsThe impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment modelsParallel ant colony optimization for resource constrained job schedulingExperimental investigation of heuristics for resource-constrained project scheduling: an updateA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingProject scheduling with finite or infinite number of activity processing modes -- a surveyResource constraint scheduling with a fractional shared resourceMulti-mode resource-constrained project scheduling using RCPSP and SAT solversA hybrid metaheuristic for the resource-constrained project scheduling problemIncreasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needsA hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durationsStrong valid inequalities for the resource-constrained scheduling problem with uniform resource requirementsSolving scheduling problems from high-level modelsA hybrid genetic algorithm for the resource-constrained project scheduling problemSolving the resource-constrained project scheduling problem using filter-and-fan approachScheduling tests in automotive R\&D projectsCapital- and resource-constrained project scheduling with net present value optimizationAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemJustification and RCPSP: a technique that paysA hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problemA survey of hybrid metaheuristics for the resource-constrained project scheduling problemSolving the discrete time/resource trade-off problem in project scheduling with genetic algorithmsAn iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problemProject selection, scheduling and resource allocation with time dependent returnsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingActivity list representation for a generalization of the resource-constrained project scheduling problemA hybrid scatter search/electromagnetism meta-heuristic for project schedulingA competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software


Cites Work


This page was built for publication: Resource-constrained project scheduling: A critical activity reordering heuristic