A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling

From MaRDI portal
Publication:2519076

DOI10.1016/j.ejor.2007.10.042zbMath1152.90464OpenAlexW2052334377MaRDI QIDQ2519076

Fereydoon Kianfar, De Reyck, Bert, Mohammad R. Ranjbar

Publication date: 22 January 2009

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://ink.library.smu.edu.sg/lkcsb_research/6754




Related Items (32)

A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraintsMIP models for resource-constrained project scheduling with flexible resource profilesMulti-mode resource availability cost problem with recruitment and release dates for resourcesGenerating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertaintyModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsEvolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system projectA branch and bound algorithm for project scheduling problem with spatial resource constraintsControllable processing times in project and production management: analysing the trade-off between processing times and the amount of resourcesRobust Capacity Planning for Project ManagementIntegrated multi-project planning and scheduling -- a multiagent approachProject scheduling with finite or infinite number of activity processing modes -- a surveyMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicUsing resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemMulti-mode resource-constrained project scheduling using RCPSP and SAT solversAn effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problemA modified PSO algorithm for minimizing the total costs of resources in MRCPSPAn efficient particle swarm optimizer with application to man-day project scheduling problemsMultimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedureConsidering project management activities for engineering design groupsA practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lagsAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesA neurogenetic approach for the resource-constrained project scheduling problemA hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problemA survey of variants and extensions of the resource-constrained project scheduling problemRailway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environmentOn the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environmentA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemSimulated annealing and tabu search for multi-mode project payment schedulingA decomposed branch-and-price procedure for integrating demand planning in personnel staffing problemsA priority-rule method for project scheduling with work-content constraintsA multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problemEnergetic reasoning for energy-constrained scheduling with a continuous resource


Uses Software


Cites Work




This page was built for publication: A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling