A robust genetic algorithm for resource allocation in project scheduling

From MaRDI portal
Publication:5948196

DOI10.1023/A:1010949931021zbMath1024.90036OpenAlexW189789383MaRDI QIDQ5948196

Concepción Maroto, Javier Alcaraz

Publication date: 31 October 2001

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1023/a:1010949931021




Related Items (36)

Experimental investigation of heuristics for resource-constrained project scheduling: an updateA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingGenetic algorithm for the resource-constrained project scheduling problemA biased random-key genetic algorithm for the project scheduling problem with flexible resourcesMultiindex optimal production planning problemsDynamic resource allocation and collaborative scheduling in R\&D and manufacturing processes of high-end equipment with budget constraintNew concepts for activity float in resource-constrained project managementStatistical design of genetic algorithms for combinatorial optimization problemsA new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesA hybrid metaheuristic for the resource-constrained project scheduling problemA lexicographic approach to the robust resource-constrained project scheduling problemA multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problemNew representation to reduce the search space for the resource-constrained project scheduling problemAn iterated local search algorithm for a place scheduling problemConsidering project management activities for engineering design groupsA hybrid genetic algorithm for the resource-constrained project scheduling problemA fuzzy time-dependent project scheduling problemA quantitative approach for scheduling activities to reduce set-up in multiple machine linesImproving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problemAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemAn effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemA neurogenetic approach for the resource-constrained project scheduling problemJustification and RCPSP: a technique that paysSolving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristicsA survey of hybrid metaheuristics for the resource-constrained project scheduling problemA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemForecasting government bond spreads with heuristic models: evidence from the eurozone peripheryA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingA MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNINGA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemActivity list representation for a generalization of the resource-constrained project scheduling problemA multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problemA hybrid scatter search/electromagnetism meta-heuristic for project schedulingEvolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-artA competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software



This page was built for publication: A robust genetic algorithm for resource allocation in project scheduling