Considering project management activities for engineering design groups
From MaRDI portal
Publication:2226486
DOI10.1007/s43069-020-00037-wzbMath1457.90080OpenAlexW3096061334MaRDI QIDQ2226486
Publication date: 8 February 2021
Published in: SN Operations Research Forum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s43069-020-00037-w
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Uses Software
Cites Work
- Unnamed Item
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations
- A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Differential evolution for solving multi-mode resource-constrained project scheduling problems
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
- PSPLIB -- a project scheduling problem library
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- An exact algorithm for project scheduling with multiple modes
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Lower bounds for resource-constrained project scheduling problems.
- PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
- Project scheduling. A research handbook.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
- Capital- and resource-constrained project scheduling with net present value optimization
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- An adaptive crossover genetic algorithm with simulated annealing for multi mode resource constrained project scheduling with discounted cash flows
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Project Scheduling Under Partially Renewable Resource Constraints
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Local search methods for the discrete time/resource trade-off problem in project networks
- New Product Development: The Performance and Time-to-Market Tradeoff
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- New Product Development Structures and Time-to-Market
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
- An efficient multi-pass heuristic for project scheduling with constrained resources
- Case-based reasoning and improved adaptive search for project scheduling
- Project scheduling with multiple modes: A comparison of exact algorithms
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
- Preselective strategies for the optimization of stochastic project networks under resource constraints
- A self-adapting genetic algorithm for project scheduling under resource constraints
- Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm
- Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Resource-constrained Project Scheduling — The State of the Art
- Solving Resource-Constrained Network Problems by Implicit Enumeration—Preemptive Case
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- A competitive heuristic solution technique for resource-constrained project scheduling
- A robust genetic algorithm for resource allocation in project scheduling
- Project scheduling with multiple modes: A genetic algorithm
- Simulated annealing for multi-mode resource-constrained project scheduling
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
- Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic
This page was built for publication: Considering project management activities for engineering design groups