Project scheduling. A research handbook.
From MaRDI portal
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) General reference works (handbooks, dictionaries, bibliographies, etc.) pertaining to operations research and mathematical programming (90-00)
Recommendations
- Scheduling of resource-constrained projects
- Project scheduling under limited resources. Models, methods, and applications
- Project scheduling with time windows. From theory to applications.
- scientific article; zbMATH DE number 2013754
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions
Cited in
(only showing first 100 items - show all)- Ambiguous joint chance constraints under mean and dispersion information
- A scatter search algorithm for project scheduling under partially renewable resources
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm
- A hybrid genetic algorithm for satellite image downlink scheduling problem
- On the strength of time-indexed formulations for the resource-constrained project scheduling problem
- Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning
- Reducing the feasible solution space of resource-constrained project instances
- A multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problem
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Optimizing version release dates of research and development long-term processes
- Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag
- Activity list representation for a generalization of the resource-constrained project scheduling problem
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology
- Dynamic order acceptance and capacity planning on a single bottleneck resource
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags
- Scheduling tests in automotive R\&D projects
- A hybrid differential evolution algorithm with column generation for resource constrained job scheduling
- scientific article; zbMATH DE number 48614 (Why is no real title available?)
- Adjacent-Resource Scheduling
- Considering project management activities for engineering design groups
- Project scheduling with irregular costs: complexity, approximability, and algorithms
- Resource constrained routing and scheduling: review and research prospects
- A flow-based tabu search algorithm for the RCPSP with transfer times
- A genetic algorithm for the robust resource leveling problem
- Computing latest starting times of activities in interval-valued networks with minimal time lags
- The total adjustment cost problem: applications, models, and solution algorithms
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
- Heuristics for a project management problem with incompatibility and assignment costs
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
- MIP-based solution approaches for multi-site resource-constrained project scheduling
- Anchored reactive and proactive solutions to the CPM-scheduling problem
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- Resource tardiness weighted cost minimization in project scheduling
- Time slack-based techniques for robust project scheduling subject to resource uncertainty
- Maximizing the expected net present value in a project with uncertain cash flows
- Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective
- An effective heuristic for project scheduling with resource availability cost
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure
- Moments and distribution of the net present value of a serial project
- Maximising the weighted number of activity execution modes in project planning
- Preface to the 12th international conference on project management and scheduling
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP
- Minimizing maximum lateness in two-stage projects by tropical optimization
- A classification of predictive-reactive project scheduling procedures
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
- Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres
- The bilevel optimisation of a multi-agent project scheduling and staffing problem
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Operating room planning and scheduling: a literature review
- Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure
- A priority-rule method for project scheduling with work-content constraints
- A float-path theory and its application to the time-cost tradeoff problem
- Nash equilibria for the multi-agent project scheduling problem with controllable processing times
- Nash equilibrium solutions in multi-agent project scheduling with milestones
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
- Modeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparison
- Mathematical programming and financial objectives for scheduling projects
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem
- A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Scheduling resource-constrained projects with a flexible project structure
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
- Optimal crashing of an activity network with disruptions
- A preemptive bound for the resource constrained project scheduling problem
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
- Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Direct solution to constrained tropical optimization problems with application to project scheduling
- Price of anarchy and price of stability in multi-agent project scheduling
- Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities
- Solving a comprehensive model for multiobjective project portfolio selection
- Comparative analysis of some metaheuristics for discrete-continuous project scheduling with activities of identical processing rates
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
- Strong bounds for resource constrained project scheduling: preprocessing and cutting planes
- An efficient solution method to design the cost-minimizing platform portfolio
- A new approach for quantitative risk analysis
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment
- An approach using SAT solvers for the RCPSP with logical constraints
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements
- Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem
- Project scheduling under uncertainty: survey and research potentials
- Resource constraint scheduling with a fractional shared resource
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- New concepts for activity float in resource-constrained project management
- Evolutionary algorithms for multi-objective stochastic resource availability cost problem
- Mixed-integer linear programming for resource leveling problems
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation
- Going to the core of hard resource-constrained project scheduling instances
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources
- A linear time-cost tradeoff problem with multiple milestones under a comb graph
- A random key based genetic algorithm for the resource constrained project scheduling problem
- Extremal properties of tropical eigenvalues and solutions to tropical optimization problems
- Resource leveling in a machine environment