GRASP and path relinking for project scheduling under partially renewable resources
From MaRDI portal
Publication:2482792
DOI10.1016/j.ejor.2006.06.073zbMath1146.90401OpenAlexW1999672292MaRDI QIDQ2482792
Fulgencia Villa, Enric Crespo, Ramón Alvarez-Valdés, José Manuel Tamarit
Publication date: 24 April 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.073
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (11)
A metaheuristic solution approach for the time-constrained project scheduling problem ⋮ A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints ⋮ A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints ⋮ A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement ⋮ A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints ⋮ Project scheduling with flexible resources: formulation and inequalities ⋮ Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement ⋮ A scatter search algorithm for project scheduling under partially renewable resources ⋮ Nash equilibria in competitive project scheduling ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A cumulative unmanned aerial vehicle routing problem approach for humanitarian coverage path planning
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Resource-constrained job scheduling with recyclable resources
- Project scheduling. A research handbook.
- Constraint propagation techniques for the disjunctive scheduling problem
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Advanced production scheduling for batch plants in process industries
- Scheduling the factory pick-up of new cars
- Project scheduling with time windows. From theory to applications.
- A scatter search algorithm for project scheduling under partially renewable resources
- Project Scheduling Under Partially Renewable Resource Constraints
- Critical-Path Planning and Scheduling: Mathematical Basis
- Scheduling the production of rolling ingots: industrial context, model, and solution method
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: GRASP and path relinking for project scheduling under partially renewable resources