A metaheuristic solution approach for the time-constrained project scheduling problem
From MaRDI portal
Publication:2362168
DOI10.1007/s00291-016-0458-7zbMath1368.90077OpenAlexW2493147122MaRDI QIDQ2362168
C. Verbeeck, Pieter Vansteenwegen, Vincent Van Peteghem, Mario Vanhoucke, El-Houssaine Aghezzaf
Publication date: 6 July 2017
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://biblio.ugent.be/publication/6847425
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
A common approximation framework for early work, late work, and resource leveling problems ⋮ The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- The total adjustment cost problem: applications, models, and solution algorithms
- Resource leveling in a machine environment
- Time-constrained project scheduling with adjacent resources
- Time-constrained project scheduling
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- An exact algorithm for minimizing resource availability costs in project scheduling
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Optimal resource leveling using non-serial dynamic programming
- Constraint propagation techniques for the disjunctive scheduling problem
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Resource levelling for projects with schedule-dependent time windows
- Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
- Mixed-integer linear programming for resource leveling problems
- Using metaheuristics in multiobjective resource constrained project scheduling
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
- GRASP and path relinking for project scheduling under partially renewable resources
- Scatter search for project scheduling with resource availability cost
- Electrical Load Management in Smart Homes Using Evolutionary Algorithms
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Optimization guided lower and upper bounds for the resource investment problem
- A new heuristic for the multi-mode resource investment problem
- A new heuristic for the multi-mode resource investment problem
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems