Resource levelling for projects with schedule-dependent time windows

From MaRDI portal
Publication:1806946

DOI10.1016/S0377-2217(98)00272-0zbMath0937.90034OpenAlexW1983545211WikidataQ126550656 ScholiaQ126550656MaRDI QIDQ1806946

Klaus Neumann, Jürgen Zimmermann

Publication date: 8 November 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(98)00272-0




Related Items (21)

Hierarchical approach to production scheduling in make-to-order assemblyA metaheuristic solution approach for the time-constrained project scheduling problemA genetic algorithm for the robust resource leveling problemAn efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow networkEnergy-oriented scheduling based on evolutionary algorithmsThe crew timetabling problem: an extension of the crew scheduling problemA lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturingThe total adjustment cost problem: applications, models, and solution algorithmsResource leveling in projects with flexible structuresOrder-based neighborhoods for project scheduling with nonregular objective functions.Resource leveling in a machine environmentAn empirical analysis of a set of hybrid heuristics for the solution of the resource leveling problemSCHEDULING THE HARVESTING OPERATIONS OF A FOREST BLOCK: A CASE STUDYMixed-integer linear programming and constraint programming formulations for solving resource availability cost problemsOptimal project duration for resource levelingManaging projects with uncertain deadlinesA multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturingMulti-objective master production scheduling in make-to-order manufacturingResource-constrained project scheduling: Notation, classification, models, and methodsA MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNINGProcedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints



Cites Work


This page was built for publication: Resource levelling for projects with schedule-dependent time windows