scientific article; zbMATH DE number 4135692
From MaRDI portal
Publication:3468865
Recommendations
- scientific article; zbMATH DE number 2013754
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions
- scientific article; zbMATH DE number 3894816
- Scheduling of project networks
- Scheduling of resource-constrained projects
Cited in
(only showing first 100 items - show all)- The resource-constrained activity insertion problem with minimum and maximum time lags
- Reoptimization of minimum and maximum traveling salesman's tours
- Computing latest starting times of activities in interval-valued networks with minimal time lags
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- Modelling setup times, process batches and transfer batches using activity network logic
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags
- A branch and bound algorithm for the resource-constrained project scheduling problem
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Heuristics for scheduling resource-constrained projects in MPM networks
- A network flow algorithm for just-in-time project scheduling
- An exact algorithm for project scheduling with multiple modes
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- Branch and bound methods for scheduling problems with multiprocessor tasks on dedicated processors
- Network scheduling techniques for construction project management
- Lower bounds for resource-constrained project scheduling problems.
- Order-based neighborhoods for project scheduling with nonregular objective functions.
- Resource-constrained project scheduling: A survey of recent developments.
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Resource-constrained project scheduling with flexible resource profiles in continuous time
- Optimizing version release dates of research and development long-term processes
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
- A hybrid framework for over-constrained generalized resource-constrained project scheduling problems
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Resource levelling for projects with schedule-dependent time windows
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Deterministic job-shop scheduling: Past, present and future
- Project scheduling with inventory constraints
- Scheduling of linear projects with single loop structures
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- Scheduling the factory pick-up of new cars
- How to make OR-results available: A proposal for project scheduling
- Mixed-integer linear programming for resource leveling problems
- Optimizing the supply chain configuration for make-to-order manufacturing
- A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints
- Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities
- A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
- Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag
- The sample analysis machine scheduling problem: definition and comparison of exact solving approaches
- On the integration of diverging material flows into resource-constrained project scheduling
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
- Solve-and-robustify
- A solution approach to find the critical path in a time-constrained activity network
- Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)
- Immediate schedule adjustment and semidefinite relaxation
- Integrated truck and workforce scheduling to accelerate the unloading of trucks
- Solving RCPSP/max by lazy clause generation
- A memetic algorithm for the job-shop with time-lags
- A compact reformulation of the two-stage robust resource-constrained project scheduling problem
- scientific article; zbMATH DE number 1594562 (Why is no real title available?)
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities
- A lexicographic approach to the robust resource-constrained project scheduling problem
- A new formulation of the resource-unconstrained project scheduling problem with generalized precedence relations to minimize the completion time
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- Resource allocation by means of project networks: dominance results
- Resource allocation by means of project networks: complexity results
- Solving project scheduling problems by minimum cut computations
- Resource loading with time windows
- Network construction problems with due dates
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Scatter search with path relinking for the job shop with time lags and setup times
- A newany-orderschedule generation scheme for resource-constrained project scheduling
- Modelling and solving generalised operational surgery scheduling problems
- Computing Tight Time Windows for RCPSPWET with the Primal-Dual Method
- scientific article; zbMATH DE number 4020831 (Why is no real title available?)
- scientific article; zbMATH DE number 4066607 (Why is no real title available?)
- The total adjustment cost problem: applications, models, and solution algorithms
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
- scientific article; zbMATH DE number 1175395 (Why is no real title available?)
- scientific article; zbMATH DE number 2013754 (Why is no real title available?)
- A min-flow algorithm for minimal critical set detection in resource constrained project scheduling
- A branch-and-bound algorithm for scheduling of new product development projects
- scientific article; zbMATH DE number 3892918 (Why is no real title available?)
- Iterative Flattening Search on RCPSP/max Problems: Recent Developments
- scientific article; zbMATH DE number 970562 (Why is no real title available?)
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- A note on the paper Resource-constraint project scheduling: Notation, classification, models and methods by Bruckner et al
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions
- Local search algorithms for a single-machine scheduling problem with positive and negative time-lags
- Scheduling with forbidden sets
- \(\Gamma\)-robust optimization of project scheduling problems
- New concepts for activity float in resource-constrained project management
- Dismantling of nuclear power plants at optimal NPV
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
- Integer optimization models and algorithms for the multi-period non-shareable resource allocation problem
- Scheduling activities in project network with feeding precedence relations: an earliest start forward recursion algorithm
- Scheduling projects with converging and diverging material flows using IBM ILOG CP optimizer -- an experimental performance analysis
- Fifty years of research on resource-constrained project scheduling explored from different perspectives
- Staggered routing in autonomous mobility-on-demand systems
- Robust optimization approach for the resource-constrained project scheduling problem with uncertain activity release times
- Heuristic approaches for a multi-mode resource availability cost problem in aircraft manufacturing
- Minimizing makespan for a bipartite graph on a single processor with an integer precedence delay.
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
- A double genetic algorithm for the MRCPSP/max
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3468865)