Scheduling of resource-constrained projects
branch and boundheuristiclower bound methodsnonlinear programmingpriority rulesproject managementproject planningresource-constrained project schedulingscheduling of execution datestabu search
Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Deterministic scheduling theory in operations research (90B35) Management decision making, including multiple objectives (90B50) Nonlinear programming (90C30) Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Approximation methods and heuristics in mathematical programming (90C59)
Project management provides efficient instruments for various situations. Especially, scheduling of execution dates for the sub-activities (jobs) required for completing the project is an important managerial task. From the mathematical point of view it is a complex problem since frequently constrained resources are reasons of conflicts between concurrent projects or between sub-activities of a single project. Part I of the book deals mainly with the resource-constrained project scheduling problem which consists in assigning execution dates to the sub-activities of a project, such that it is terminated as early as possible without exceeding the availabilities of the resources. A generalized version of the problem is presented which is considered by most of the commercial management software packages on hand including possible extensions examined in the literature. It includes Chap. 1: The project management process; Chap. 2: Project planning and control; Chap. 3: Resource-constrained scheduling problems. Part II of the book is devoted to solution methods for resource-constrained project scheduling. Since the problems of this type are NP-hard, procedures which yield satisfactory solutions in a reasonable computation time should be developed. A number of new approaches are introduced for this purpose, e.g. heuristic procedures based on priority rules and tabu search, lower bound methods, branch and bound procedures and others including tests of their effectiveness and comprehensive computational experiments. Part II contains: Chap 4: Lower bound methods; Chap. 5: Heuristic procedures (i.e. priority-rule based methods and improvement methods); Chap. 6: Exact procedures (mainly branch and bound procedures); Chap. 7: Computational experiments.
- Resource-constrained project scheduling and timetabling
- Resource Constrained Scheduling within Fixed Project Durations
- Scheduling resource-constrained projects with a flexible project structure
- Scheduling of multiple projects with constrained resources and preemption
- Project scheduling under limited resources. Models, methods, and applications
- A constraint-based perspective in resource constrained project scheduling
- scientific article; zbMATH DE number 5926137
- Resource-constrained project scheduling with time windows
- Resource allocation for robust project scheduling
- scientific article; zbMATH DE number 89107
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure
- A priority-rule method for project scheduling with work-content constraints
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- A model to optimize project resource allocation by construction of a balanced histogram
- A comparative study of computational procedures for the resource constrained project scheduling problem
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Scheduling project activities in a distributed environment
- A local constraint based analysis approach to project scheduling under general resource constraints
- Project scheduling. A research handbook.
- On the strength of time-indexed formulations for the resource-constrained project scheduling problem
- Resource tardiness weighted cost minimization in project scheduling
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
- A hybrid framework for over-constrained generalized resource-constrained project scheduling problems
- Justification and RCPSP: a technique that pays
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Resource levelling for projects with schedule-dependent time windows
- Project scheduling with inventory constraints
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
- An efficient time-windowing procedure for scheduling projects under multiple resource constraints
- Project scheduling with time windows. From theory to applications.
- How to make OR-results available: A proposal for project scheduling
- Solving the resource constrained project scheduling problem with optimization subroutine library
- Project scheduling under limited resources. Models, methods, and applications
- A Benders' decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problem
- Resource-constrained project scheduling with activity splitting and setup times
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- Integration of equipment planning and project scheduling
- Pre-emption in resource-constrained project scheduling
- Project selection, scheduling and resource allocation with time dependent returns
- Editorial ``Project management and scheduling
- Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences
- MIP models for resource-constrained project scheduling with flexible resource profiles
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem
- Project Scheduling Under Partially Renewable Resource Constraints
- A term-based approach to project scheduling
- scientific article; zbMATH DE number 1808554 (Why is no real title available?)
- Scheduling resource-constrained projects with a flexible project structure
- Optimal product line pricing in the presence of budget-constrained consumers
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- Modeling block structured project scheduling with resource constraints
- scientific article; zbMATH DE number 3854787 (Why is no real title available?)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation
- scientific article; zbMATH DE number 4135692 (Why is no real title available?)
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem
- scientific article; zbMATH DE number 4095193 (Why is no real title available?)
- Scheduling modular projects on a bottleneck resource
- Resource constrained project scheduling basic properties
- A constraint-based perspective in resource constrained project scheduling
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions.
- A bidirectional heuristic for maximizing the net present value of large-scale projects subject to limited resources
- Project scheduling with time-varying resource constraints
- The resource constrained project scheduling problem: a theoretical comparison between a recent formulation and the main time indexed linear programming based approaches
- Scheduling recurrent construction
- Tools for resource-constrained project scheduling and control: forward and backward slack analysis
- Disruption management for resource-constrained project scheduling
- First results on resource-constrained project scheduling with model-endogenous decision on the project structure
- Resource Constrained Scheduling within Fixed Project Durations
- A new exact resource allocation model with hard and soft resource constraints
- Schedule this -- a decision support system for movie shoot scheduling
- Priority-Rule Methods for Project Scheduling with Work Content Constraints
- Project scheduling with precedence constraints and scarce resources: an experimental analysis of commercial project management software
- Cost-efficient project management based on critical chain method with partial availability of resources
- scientific article; zbMATH DE number 3312375 (Why is no real title available?)
- Multi-mode resource constrained project scheduling problem along with contractor selection
- Project scheduling with calendars
- Resource allocation with project management software
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions
- Tri-directional scheduling scheme: theory and computation
- Scheduling and constraint propagation
- Project management and scheduling: a permanent challenge for OR
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Maximising the weighted number of activity execution modes in project planning
- A new time-driven mixed-integer programming model for rough-cut capacity planning
- On a fix-and-relax framework for a class of project scheduling problems
- Scheduling of multiple projects with resource transfers
- Multi-objectives tabu search based algorithm for progressive resource allocation
- Data-dependency graph transformations for instruction scheduling
- Knowledge integration using problem spaces: A study in resource-constrained project scheduling
- Methods to solve multi-skill project scheduling problem
- Scheduling projects with heterogeneous resources to meet time and quality objectives
- Scheduling tests in automotive R\&D projects