Project selection, scheduling and resource allocation with time dependent returns
From MaRDI portal
Publication:2519075
DOI10.1016/j.ejor.2007.10.040zbMath1152.90483OpenAlexW2056446456MaRDI QIDQ2519075
Jiaqiong Chen, Ronald G. Askin
Publication date: 22 January 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2007.10.040
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Resource and cost allocation (including fair division, apportionment, etc.) (91B32)
Related Items (7)
Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project ⋮ Optimizing resource-constrained project scheduling problem considering the reliability function ⋮ A clustering‐based review on project portfolio optimization methods ⋮ Resource-constrained multi-project scheduling problem: a survey ⋮ A multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problem ⋮ Revenue sharing for resource transfer among projects ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Dynamic project selection and funding under risk: A decision tree based MILP approach
- PSPLIB -- a project scheduling problem library
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- An exact algorithm for project scheduling with multiple modes
- A steepest ascent approach to maximizing the net present value of projects
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Lower bounds for resource-constrained project scheduling problems.
- A branch-and-bound algorithm for the resource-constrained project scheduling problem
- Project scheduling. A research handbook.
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
- A linear programming and constraint propagation-based lower bound for the RCPSP
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- On the generation of circuits and minimal forbidden sets
- Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
- Justification and RCPSP: a technique that pays
- Resource-constrained project scheduling: Notation, classification, models, and methods
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- Rangen: A random network generator for activity-on-the-node networks
- Perspectives in modern project scheduling.
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Solving Project Scheduling Problems by Minimum Cut Computations
- Project Scheduling Under Partially Renewable Resource Constraints
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- Complex Scheduling
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Local search methods for the discrete time/resource trade-off problem in project networks
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
- Project scheduling with multiple modes: A comparison of exact algorithms
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
- A self-adapting genetic algorithm for project scheduling under resource constraints
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
- A competitive heuristic solution technique for resource-constrained project scheduling
- Simulated annealing for multi-mode resource-constrained project scheduling
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
- Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds
- Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
This page was built for publication: Project selection, scheduling and resource allocation with time dependent returns