A self-adapting genetic algorithm for project scheduling under resource constraints
From MaRDI portal
Publication:4803318
DOI10.1002/nav.10029zbMath1013.90062OpenAlexW2120810386MaRDI QIDQ4803318
Publication date: 2 April 2003
Published in: Naval Research Logistics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.10029
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (40)
A genetic algorithm for the robust resource leveling problem ⋮ A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem ⋮ An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem ⋮ An integer programming approach to the multimode resource-constrained multiproject scheduling problem ⋮ A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource ⋮ Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation ⋮ Experimental investigation of heuristics for resource-constrained project scheduling: an update ⋮ A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling ⋮ Genetic algorithm for the resource-constrained project scheduling problem ⋮ A branch and bound algorithm for project scheduling problem with spatial resource constraints ⋮ A biased random-key genetic algorithm for the project scheduling problem with flexible resources ⋮ An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case ⋮ Resource constraint scheduling with a fractional shared resource ⋮ A hybrid metaheuristic for the resource-constrained project scheduling problem ⋮ Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs ⋮ Tri-directional scheduling scheme: theory and computation ⋮ Considering project management activities for engineering design groups ⋮ A hybrid genetic algorithm for the resource-constrained project scheduling problem ⋮ A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags ⋮ A random key based genetic algorithm for the resource constrained project scheduling problem ⋮ Meta-heuristics for stable scheduling on a single machine ⋮ Towards merging binary integer programming techniques with genetic algorithms ⋮ A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles ⋮ Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem ⋮ An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem ⋮ A neurogenetic approach for the resource-constrained project scheduling problem ⋮ Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems ⋮ Justification and RCPSP: a technique that pays ⋮ A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem ⋮ A survey of hybrid metaheuristics for the resource-constrained project scheduling problem ⋮ A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem ⋮ Project selection, scheduling and resource allocation with time dependent returns ⋮ A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling ⋮ A 3/2-approximation for big two-bar charts packing ⋮ Probability mechanism based particle swarm optimization algorithm and its application in resource-constrained project scheduling problems ⋮ Two-bar charts packing problem ⋮ Flexible job-shop scheduling problem under resource constraints ⋮ A hybrid scatter search/electromagnetism meta-heuristic for project scheduling ⋮ Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art ⋮ A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
Cites Work
This page was built for publication: A self-adapting genetic algorithm for project scheduling under resource constraints